No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Type | Commercial Circular |
|---|---|
| Topic | freight |
| Currency | Currency not verified |
rule (1) shall not be less than a. 400mts in case of TALQ signalling or TACLS, and b. 180mts in case of MAS or Modified Lower Quadrant Signalling Loco Pilot of the first train shall stop his train at the next block station and give
STATION MASTER AS 11 (OCTOBER 2023) 1 OPERATING STUDY MATERIAL FOR STATION MASTERS (Updated up to A.S.NO 11 TO G&SR, A.S.NO.6 to Accident. Manual & A.S.NO 5 to BWM) STATION MASTER AS 11 (OCTOBER 2023) 2 DISCLAIMER This Guide is compiled by the Faculty of ZRTI/MLY for guidance and easy understanding. It is to be read in conjunction with G&SR, Block Working Manual, Accident Manual, Disaster Management Plan, Operating Manual, Amendment slips, JPO's, Working Time-Table and Safety related Circulars issued from time to time. Though the sufficient care and precaution has been taken while preparing this material, wherever any conflicting opinion occurs, presentation in the rule books prevails over this material. ********** STATION MASTER AS 11 (OCTOBER 2023) 3 INDEX S.No RULE No. TOPIC Page No. 1. Significance of rule books 8-10 2. 1.02 Important Definitions 13-16 3. Differences (G.R & S.R, facing point and trailing point,Block Section & Non block Section) 17-18 4. 1.03 Classifications of stations 18 5. G.R.3.27 &3.29 Minimum equipment of fixed signals 18 6. G.R.1.02(2), G.R. 8.01 , 3.40 Adequate distance 19 7. G.R.1.02(32), S.R.3.50 Isolation 19 8. G.R.1.02(54 Station section 19-20 9. G.R.3.02 Types of signals 21 10. Fixed signals 22 11. G.R/S.R. 3.07 (Permissive)-Distant signal 22 12. G.R.3.09 Reception signals (Outer, Home signal) 22 13. SEM Part I Route indicators 23 14. G.R.3.10 Despatch signals(Starter, Advance Starter) 24 15. G.R.3.15 Co-acting signal 25 16. G.R.3.16 Repeating signal 25 17. G.R.3.13 Calling on signal 25 18. G.R.3.14 Shunt signal 25-26 19. S.R.3.14.3 Shunting permitted indicator 26 20. G.R./S.R.3.75, S.R.14.13,14.14 IB signal 27-28 21. G.R/S.R.3.34,3.7 3 Gate signal 28-29 22. G.R/S.R. 3.73 Passing Gate Signal 29 23. G.R/S.R 3.59 to 3.64 Fog signal 29-30 24. S.R. 3.61 VTO 30 25. G.R.3.65,66 & 67 Signals to warn incoming trains of danger ahead 31 26. Appendix XII –I Interlocking 31-32 27. SR3.50.2,3.51.3.1 GR/SR.3.50 Differences (Point & trap indicator, slip and catch siding, SLB & BSLB) 32-33 28. S.R 3.38.3.1 Testing of Reception Signals 33 29. SR 3.51.6 Disconnection & Reconnection 34-35 STATION MASTER AS 11 (OCTOBER 2023) 4 30. GR 3.38 Points effecting Movement 35 31. GR/SR 3.40 Condition for taking off home signal 36 32. (GR/SR 3.47) Taking ‘off’ signals for more than one train at a time 36 33. S.R.3.38.7, App XI-6 Motor operated points 36-37 34. S.R.3.38.7, App XI-6 Emergency crank handle 37 35. AppXI-6,G.R/SR 3.68,3.69 and 3.70 Defective signals, Reception Signals defective, Despatch Signals Defective 38-39 36. S.R.3.75 IB signal defective 39 37. S.R.3.69.14 Reception of a train when passed a reception signal at “ON” 40 38. S.R.3.70 Procedure to Despatch the train when passed Starter & Advance Starter at ‘ON’ 41 39. CHAPTER-IV 42 40. G.R.4.12 Engine pushing 42-43 41. G.R.4.19.6 BV equipment 43 42. S.R.4.25.3 Vehicle guidance (VG) 44 43. WTT Working time table 44-45 44. S.R.4.23 Running of goods train without brake- van 45 45. S.R.4.25.4 Running of goods train without Guard 46 46. G.R. 4.29 Hot axle/hot box. 47 47. JPO Flat Tyre 47-48 48. S.R.4.24.4 Attaching of damaged vehicle/ engine 48 49. G.R/S.R 4.35 Starting of trains 48-49 50. G.R.4.42 Exchanging of all rights signals 49-51 51. S.R.4.17 Responsibility of SM when he notices train passing without tail lamp/tail light 51 52. G.R. 4.44 Train held up at home /FSS signal 51 53. S.R.4.62 Working of material train 51-52 54. S.R.4.65 Track tamping machine (TTM) 52-54 55. C&W JPO NO. 4/2023 Brake power certificate & GLP check 54-57 56. G.R.5.06 and Appendix XIV Station working rules 58-59 57. G.R.5.09 Reception of a train on an obstructed line 60 58. G.R.5.10 Reception of a train on a non-signalled line 60 STATION MASTER AS 11 (OCTOBER 2023) 5 59. G.R.5.11/12 Departure of a train from non-signalled line 60 59. G.R/S.R 5.13/5.14 Shunting 61 60. G.R/S.R.5.14=19 Control and Responsibility of Shunting 61-63 61. Appendix XII Shunting authorities 63-64 62. G.R/S.R
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,233 documents