No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | no. 2024/TT-IV/12/10 |
|---|---|
| Date | 2024-08-29 |
| Type | Commercial Circular |
| Topic | freight |
| Currency | Currency not verified |
Issue of Correction Memo No. 89 to G&SR of South Western Railway The Station Master shall give the Loco Pilot/Motorman and Train Manager of each train
दक्षिण पश्चिम रेलवे SOUTH WESTERN RAILWAY क्षेत्रीय प्रधान कार्यालय/20ा81 | leadquarters Office, परिचालन विभाग/ Operating Department, odie तल, पूर्व BS/2" floor, East Block, गदग रोड़ /Gadag Road, हुब्बल्लि /Hubballi-580 020 No: T.157/SWR/G&SR/PCOM/Vol. V/04 दिनांक/ Date:29.08.2024. Divisional Railway Manager, South Western Railway, Hubballi, Bengaluru & Mysuru. Sub: Issue of Correction Memo No. 89 to G&SR of South Western Railway. Ref: RB letter no. 2024/TT-IV/12/10, dated 16.08.2024. नं के के के के With reference to above, a four-member SAG committee, formed by Railway Board has formulated Unified Subsidiary Rules to General Rules 9.12 to be followed in Automatic Block System. The main objective has been to provide clear instructions to Station Master, Loco Pilot and Train Manager for working of trains during failure of Automatic Signalling and to minimize the number of paper authoritiesto be issued to Loco Pilot and Train Manager during such failures. The salient aspects are as follows: 1. New para 9.12/1 has been added that states that during failure of signal/s in Automatic Block System train operation will be done in accordance with rule-9.02 (DL) and rule-9.07 (SL). 2. The forms — T/A 912, T/D 912, T/B 912, T/C 912, T/B 602 & T/510 have been reframed as per the conditions in which they are to be issued (including one or more of the following authorities): a) Condition of passing signal at ON b) Authority to Proceed without Line clear c) Circumstance under which authority is given d) Caution order specifying the Speed to be followed e) Line clear ticket T/C 912 — shall be used for sending Relief Engine/Train on the obstructed line in case ofobstruction or accident in an Automatic Block Signalling section. 3. Different procedures are being followed in various Zonal Railways for temporary single line working in Automatic Block Signalling territories. To standardize the various procedures being followed, a new form T/E-912 has been introduced “AUTHORITY FOR TEMPORARY SINGLE LINE WORKING ON DOUBLE LINE AUTOMATIC BLOCK SIGNALLING TERRITORIES”. 4. Unified SR 9.12 has been framed to cater to train working rules in cases of failures which are common in nature to all zonal railways. Special cases would vary from railway to railway. In the proposed USR the basic principle of train operation during failure of Automatic Signalling in double line and single line section has been dealt with. The same principles should be used/applied for train operation in special cases (like Quadruple lines, Hexaple lines etc.) by the railways. 5. Presently, no guideline is prescribed for passing a Semi-Automatic signal in ‘ON’ or defective condition. Provision of issuing form T/369(3) has been made for the IPN V4 Page 1 of 19 same. Standard format of T/369(3b) with relevant modification is also being issued along with the unified Subsidiary rule. T/A 912 shall not be used for such cases. 6. Use case of T/A 912 has been defined clearly and has not been used as a standalone authority. 7. Fixed Telephone with CUG sim is being permitted as a means of communication. Following procedure is suggested: a) The CUG phone may be used as FCT (Fixed Cellular Telephone). b) Every Station should have a unique CUG number and the same should be mentioned in the Working Time Table. c) The CUG phone should be always with the ‘On Duty’ Station Master and handed over to the reliever in writing as per essential equipment. d) CUG based FCT phone may be provided at the time of commissioning of Automatic Signalling Territory. 8. The summary of The Unified Subsidiary Rule of General Rule 9.12 is as below: S.R. 9.12/1: - In case of failure of signal or signals between two or more block stations in Automatic block system. S.R. 9.12/2 (A):- Failure of signal/s between two or more block stations in Automatic block system likely to last for some time or cause serious delay when means of communications are available. S.R. 9.12/2 (B):- Failure of all signal
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,025 documents