SM shall ensure that no Train is occupying or ready to enter the adjacent line before permitting the last Train mentioned in the LB order.

Text of the circular

<!-- Slide number: 1 -->

# LINE BLOCKRef : - GR/SR 15.06I R P W MCompiled by: - S Velraj

<!-- Slide number: 2 -->
What is Line Block ?

Totally obstructing a portion of running line,
Outside Station limits
For considerable duration
To carry out Engineering works
TRAFFIC TRAINS NOT PERMITTED

<!-- Slide number: 3 -->
Application BY Eng Offl not below JE/P.Way to DRM through SM,
At least 24 hours in advance with following details,
Between Stations, Location with KM
Nature of work, Duration
Whether portable tele provided, Spot in Level or Gradient
Last Train after LB required

<!-- Slide number: 4 -->

SM shall relay message to DRM.
DRM will consider :-
The Traffic in Section
Ensure detention to Trains are minimum & then Permit work.

<!-- Slide number: 5 -->
Once permitted, SM shall,
Write LB order message on top of TSR in red ink till the work commences.
Remove shunt key at both ends.
Place Line Block Collars on Block Instruments.
Advise LB order to other end SM & to Engineering Official with acknowledgement.

<!-- Slide number: 6 -->
If LTC asked, Train mentioned in LB order stopped out of course and,
To Guard: LTC issued in duplicate, addressed to NONE.
One copy to Engineering Official at work spot and acknowledge copy to other end SM.
To LP: Caution order issued to stop at WS & Other Station.
LP to stop Train on getting HD signal at work spot.

<!-- Slide number: 7 -->
# LAST TRAIN CERTIFICATE
	The Line between --------------  Station and    ---------    Station will  be blocked for engineering Purpose from ---hrs after train No., clears section until ---hrs  on ----date.
Station:
Date: 				Signature of SM

<!-- Slide number: 8 -->
H/O one copy of LTC to Eng  Offl, hand over acknowledgement to other end SM.
If Guard lost LTC, he shall declare that.
Eng Offl issue a written memo to DRM, stating that LB commenced as per the LB order.
If Eng Offl not available at work spot both copies handed over to other end SM.

<!-- Slide number: 9 -->
Trains Permitted
Traffic Trains – shall not be allowed in any circumstance
Departmental Trains:
Any number of depart Trains, auth in writing by Eng Offl can be started from either end.
Authority: T/A 602
Before starting, SM to suspend B I Working .
Exchange numbered message with other end SM.
PN from other end shall be mentioned in T/A 602
TMM , TW, SPV -  T/465E

<!-- Slide number: 10 -->

You are authorised to allow Train No…………… description ………….into the Obstructed section between (station)……… ..... and (station)……………. on. .................. Date ………………. at………………..(hours) The section should be cleared before …………..(hours) …………. (minutes the line is obstructed from (kilometre)…………….. to (kilometre)……………… for engineering purposes.
# Written authority from Engineering Official

<!-- Slide number: 11 -->

It is responsibility of Engineering Official not to commence the work till he gets LB permitted message.
After LB commenced, entries in TSR made in Red ink below last Train entry duly advising other end SM.

<!-- Slide number: 12 -->
Extension
If Eng Offl wants LB extension, that shall be relayed to DRM.
If permitted, entries in TSR made in Red ink.
Till extended time Trains not permitted.
If even after permitted time, NO Extension or Removal advise received,
A Traffic Train waiting can be started with Normal Authority + Caution Order.
LP shall proceed cautiously throughout the entire Section.

<!-- Slide number: 13 -->
Removal
After LB completed, immediately advised to SM in writing.
After removal advise received from Engineering Official, SM to ensure,
All departmental Trains entered Section, cleared Section at any end.
Exchange numbered message to that effect& LB removal message also in TSR.
Reinsert Shunt key & Resume normal working.

<!-- Slide number: 14 -->
Line Block on Double Line

When both lines to be obstructed,
SM shall ensure that no Train is occupying or ready to enter the adjacent line before permitting the last Train mentioned in the LB order.
When LB is required to 

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents