GSU Gati Shakti Units in Divisions

No.2021/W-1/Gen1./Gati · 2022-07-27
Currency not verifiedStudy materialfreight
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo.2021/W-1/Gen1./Gati
Date2022-07-27
TypeCommercial Circular
Topicfreight
CurrencyCurrency not verified

Summary

Newly created Gati Shakti Directorate - Headed by AM / PED (Gati Shakti)

Text of the circular

GSU - Gati Shakti Units in Divisions
●
Authority: Railway Board Letter No.2021/W-1/Gen1./Gati Shakti dated: 27.07.2022.
Click for the Letter Railway Board Letter
●
GSU stands for Gati Shakti Unit
●
Policy Decision has been taken to establish GSUs in all 68 Divisions of Indian
Railways
Organization structure of GSU at Division
●
Headed by CPM - Chief Project Manager. CPM is under the administrative control
of DRM - Divisional Railway Manager
●
CPM post - open to all cadres (except IRPFS - Indian Railways Protection Force
Services)
●
If more than two ADRMs are available in the Division - the post of one ADRM will be
re-designated as CPM. If having two or one ADRM in the Division, make suitable
adjustments in the cadre.
●
Establishment expenditure of GSUs - charged to respective Projects.
●
Officers of Civil Engineering, S&T, Electrical, Traffic & Finance will be posted at GSU
●
Associate Finance for GSU - Sr.DFM of the Division
●
DFM/ADFM along with SSO(A) & other staff - posted exclusively for GSU - Will work
under the functional control of Sr.DFM but under the administrative control of CPM/GSU
●
Surveys - GSU
●
RET/PET surveys - henceforth are called Feasibility Study.
●
Undertaking Feasibility Study & Preparation of DPR - Detailed Project Report for the
Projects
- by GSU's only. Necessary changes in the Engineering Code are being
processed separately.
●
Expenditure to be charged to erstwhile Demand No.02
●
Finance Concurrence - Sr.DFM
●
Rates - are communicated by the Railway Board from time to time.

●
Processed on IRPSM - Indian Railways Project Sanctions & Management
●
Feasibility study report - examined by the NPG of the Division (NPG stands for Network
Planning Group)
●
Dy.COM/Planning/Hqrs - co-opted in NPG
●
Approval of Feasibility Study- DRM
●
Approval for Preparation of DPR - GM
●
DPRs will be prepared by the GSU of the Division only
●
Approved DPRs (by GM) along with the Finance concurrence of GSU at Division
(Finance concurrence at Hqrs will not be required) - will be submitted to the newly
created Gati Shakti Directorate in the Railway Board.
Technical, Administrative & Financial powers of GSUs of the Divisions
●
Analogous to the Officers of the Construction Organisation for the projects.
●
DRM & CPM have powers of CAO/C & SAG officer in Construction for the execution of
works of GSU.
●
Proposals requiring the sanction of the Railway Board should be sent directly to the Gati
Shakti Directorate with approval of GM and concurrence of associated finance at
Division (Not Hqrs)
●
Existing Divisional units dealing with ESPs, SWRs, SIPs, and LOPs shall also assist the
GSU. If further assistance is required, it may be arranged through outsourcing.
●
Supervision and Execution of Works - Can use PSSA (Project Supervisors Services
Agencies) and PMS as per the need of the Project
●
Also, hire retired Railway supervisors below the age of 65 years with the approval of
DRMs - within the overall provisions in the estimates of the projects
●
Air travel outside the Zonal Railways - permitted for Offices & Supervisors - in
connection with works - With DRMs approval. Concurrence is not required.
●
Accommodation – In case of shortage, leased accommodation may be provided and
house retention is also allowed at the previous place of posting up to one year or
scholastic year whichever is earlier.

●
GM nominates one HAG or SAG officer at Hqrs - as Zonal co-ordinator for GSUs in
Divisions in that Zonal Railway
Gati Shakti Directorate
Objects:
1.
To bring synergy and to improve efficiency of the system
2.
To create additional rail infrastructure
3.
Enhance railway market share in country’s cargo loading
4.
Reduce logistic cost
●
Headed by AM / PED (Gati Shakti)
●
Report to Member Infrastructure, Railway Board
●
All proposals emanating from Gati Shakti Directorate - Concurred by its own Associate
Finance headed by ED/GS (Finance) - Executive Director/Gati Shakti
●
New Directorate was created by clubbing the following Plan Heads
➜1100 - New 

Extract shown above; the full text is available in the search app.