C
Commercialpedia Indian Railways commercial circulars and policies

Necessary modalities have been incorporated in IRPSM portal- Gati shakti and DRM priority works

No. 2017/CE-1/WP/2018-19/Ipt. · 2023-01-30
Currency not verifiedCircularfreight
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo. 2017/CE-1/WP/2018-19/Ipt.
Date2023-01-30
TypeCommercial Circular
Topicfreight
CurrencyCurrency not verified

Summary

Necessary modalities have been incorporated in IRPSM portal- Gati shakti and DRM priority works General Secretary, NFIR, Rail Bhawan, New Delhi

Text of the circular

Wi, भारत सरकार Government of India दर ==

रेल मंत्रालय Ministry of Railways

आज़ादी का 2 Azadi
अमृत महोत्सव (रेलवे बोर्ड Railway Board) Amrit Wahotsav
No. 2017/CE-1/WP/2018-19/Ipt. New Delhi, Dated 30.01.2022
As per list attached.

Sub: Necessary modalities have been incorporated in IRPSM portal- Gati shakti
and DRM priority works
Ref: (i) This office letter of even No. dated 19.07.2018, 30.09.2019, 14.10.2022 &
27.10.2022
(ii) Railway Board’s letter No. 221/W-I/Genl/Gati Shakti, dated 27.07.2022

1. Railway Board vide letter dated 19.07.2018 read with letter dated 30.09.2019, had issued
the ‘Procedure to be followed for Execution of Umbrella Works under different Plan Heads’.
2. Later on, Railway Board vide letters dated 14.10.2022, 27.10.2022 and 27.07.2022 has issued
various itstruction to expedite the execution of works.
3. In order to incorporate above, necessary modalities have been incorporated in IRPSM portal
and same will be available on the portal from Feb 3/2023, as under:
a. Work proposed by Divisional Gati Shakti Unit(s) requiring sanction of Railway Board
(under Gati Shakti Tag)
i. For processing of above Gati Shakti Proposal, Gati Shakti Tag has been incorporated
in the IRPSM web portal.
ii. | Under Gati-Shakti Tag, proposal will be sent directly to the Gati Shakti Unit/ nodal
Executive director of Railway Board with concurrence of the associate finance of the
Gati Shakti Unit of the division, and with the administrative approval of the General
Manager.

b. Work proposed by Divisional Railway Manager (DRM) for sanction of Railway Board,
custing up to 10 Cr (under DRM Priority works Tag)

i. For processing of above work, as per Railway Board’s letter No. 2017/CE-
I/WP/2018-19/1pt dated 27.10.2022, DRM Priority Works tag has been created on
the IRPSM for proposal and on IREPS for tendering.

ii. | Under DRM Priority Works tag on IRPSM, proposal will be sent directly to the Nodal
Executive director of Railway Board with concurrence of associate finance of the
division and duly forwarded by General Manager on IRPSM portal.

iii. | DRM may go ahead with tendering process pending sanction of work by Railway
Board. However, acceptance letter shall be issued only after work is sanctioned by

Railway Board.
4. The existing procedure shall be followed for sanction of Works except for the cases mentioned
in Para: 28) & (b) above. पी, aot et

(अजीत PAR ay

कार्यपालक निदेशक/सिविल इंजी.(जी)/रेलवे बोर्ड
[Phone: 030-44803: Rly: 011-23383379:MTNL]
e-mail address : [email removed]

No. 2017/CE-I/WP/2018-19/1pt. New Delhi, Dated 30.01.2023,

Copy forwarded for information to:
(i) The PFAs, All Indian Railways.

(ii) Dy. Comptroller and Auditor General of India (Railways), Room No. 224, Rail “TR

Delhi. = \es
For Member Fi c

Page 1 of 2

LIST FOR DISTRIBUTION (Letter No. 2017/CE-I/WP/2018-19/1pt., dated 30.01.2022)

4S

(A)

(B)

EOS Ge eb

(C)

= SOO & Res =

Ih
12.

13.
14.

C

(A)

से ios oe lS लू

— ने ले
Neo

(B)

—

wn

General Managers, All Indian Railways & Production Units

General Manager (Con), N.F. Railway, Guwahati

General Manager /CORE, Allahabad.

Chief Administrative Officers (Con), All Indian Railways (Except N.F. Railway)
Principal Chief Engineers, All Indian Railways

CAO, COFMOW, Tilak Bridge, New Delhi
Principal CAO, Diesel Loco Modernization Works, Patiala (Punjab)

CAO (Workshop Projects), Chamber Bhawan, Judge’s Court Road, Anta Ghat, Patna-800001,
Bikar

Director General, RDSO, Manak Nagar, Lucknow

Director General, NAIR, Vadodara

Director, IRICEN, Pune — 411 001 (Maharashtra)

Director, IRIEEN, PB No.-233, Nasik Road-422101 (Maharashtra)

Director, IRISET, Taa Naka Road, Lalla Guda, Secunderabad-500017

Director, IRIMEE, Jamalpur Distt-Jamalpur, PIN-811214 (Bihar).

Director, IRITM, Sarswati Residential Estate, [RITM Campus, Manak Nagar, Lucknow

MD, CONCOR, Concor Bhawan, C-3, Mathura Road, Opp. Apollo Hospital, New Delhi- 110076.
IRCON International Limited, C-4, District Centre, Saket, New Delhi- 11

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents