C
Commercialpedia Indian Railways commercial circulars and policies

Introduction of Engine on Load (EOL) Scheme for Greenfield PET of M/s Vimla Infrastructure (India) Private Limited (VIPN) served by Narsingapalli Station of…

· 2020-06-23
Currency not verifiedCircularfreight
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2020-06-23
TypeRates Master Circular
Topicfreight
CurrencyCurrency not verified

Summary

Introduction of Engine on Load (EOL) Scheme for Greenfield PET of M/s Vimla Infrastructure (India) Private Limited (VIPN) served by Narsingapalli Station of BZA Division and within such time as specified by Railway Board from time to time and

Text of the circular

COMMERCIAL CIRCULAR LETTER No.180 OF 2020
DRAFT NOTIFICATION FOR TRC No.09 OF 2020
(Goods)

Sub: Introduction of Engine on Load (EOL) Scheme for Greenfield PET of
M/s Vimla Infrastructure (India) Private Limited (VIPN) served by
Narsingapalli Station of BZA Division.
Ref: Commercial Circular Letter No.82 of 2017 & 98 of 2017.
1. With effect from 10-3-2017, the Greenfield PFT of M/s Vimla Infrastructure (India) Private
Limited served by Narasingapalli Railway Station was notified for handling all traffic except “C”
priority Coal and Coke vide this office Commercial Circular No. 82 of 2017. However, outward
loading of Coal and Coke under “D” Priority is allowed. PFT owners may also be permitted to

handle outward Iron Ore or Iron Ore Pellet traffic from PFTs. This PFT is not opened to handle
POL traffic.

2. The Alphabetical Code and Numerical Code of the PFT is as under:

Name of the Greenfield Private Freight Alphabetical Numerical
Terminal Code Code

Ms Vimla_ Infrastructure (India) Private VIPN 09028631
Limited served by Narsingapalli Station

3. M/s Vimla Infrastructure (India) Private Limited (VIPN) served by Narsingapalli
Station further requested for introduction of Engine on Load (EOL) Scheme in terms of
Para 12 and Sub-Para 12.10 of Master Circular on PFT2020/0 dated 23.06.2020.

4. The Competent Authority has approved for implementation of Engine on Load
(EOL) Scheme with effect from 04.09.2020 for a period of one year for the Greenfield PFT
of M/s Vimla Infrastructure (India) Private Limited (VIPN) served by Narsingapalli Station.

5. The validity period of one year with effect from 04.09.2020 to 03.09.2021 is in
accordance with the terms and conditions laid down vide Freight Marketing Circular No.5
of 2013 and that of EOL agreement executed between South Central Railway and
M/s Vimla Infrastructure (India) Private Limited (VIPN).

6. Free Time for Loading/unloading of various types of block rakes under the Engine
on Load (EOL) Scheme as notified by Railway Board is as under:

S.No. | Types of Rake | EOL Free Time

in hours & Minutes)
_ | __ Loading | Unloading _|
Open Rake (BOXN etc. |. 3.00 | 5.00 |

Hopper Rake (BOBR etc ) | 3.00 2.00 a
etc.)
ae

Covered Rake (BCN, BCNHL 6.00 + 6.00

Tank rake (BTPN etc.) 5.00 | 5.00 | |

lo] oa!
|

#1 G9)

The free time mentioned above is governed by the Rates Circular No.23 of 2012. In case
any changes are made by Railway Board in the free time in future, the same will be applicable at
this Private Freight Terminal also from the date of Such changes.

7. In case loading/unloading operations exceed the permissible EOL free time. demurrage
charges will be applicable as per the extant rules.

8. The free time mentioned above will be reckoned for loading/unloading of rakes from their
placement to release. he

Da ५

4
Contd.. pg 2

Ze

In continuation of Commercial Circular Letter No.xxx of 2020 Draft Notification for TRC
No.09 OF 2020 (Goods)

Sub: Introduction of Engine on Load (EOL) Scheme for Greenfield PFT of M/s Vimla
Infrastructure (India) Private Limited (VIPN) served by Narsingapalli Station of BZA Division.

9. Exemption from Engine Hire Charges:

If the Terminal Management Company requires to utilize the Train Engine during
loading/unloading of the rake, within the free time prescribed, the same will be allowed without
levying any additional shunting charges. However, if the Railway locomotives are used beyond the
permissible free time, then applicable shunting engine charges will be levied for the extra time
taken after expiry of free time. Shunting charges shall be levied form expiry of free time under EOL
to the rake departure time from the siding at the rate of All India Engine Hour Cost notified from
time to time.

9. Shunting charges accrued on account of extra detention of engines beyond the free time
shall be raised by Railway Administration on a ten day period basis and payment of such charges
also shall be done regularly by Terminal Management Company within ten 

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents