No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Type | Commercial Circular |
|---|---|
| Topic | reservation |
| Currency | Currency not verified |
By the time second train reaches IB signal, first train may clear into advance station and SM will get Line Clear (1 PN) to enter IB section.
<!-- Slide number: 1 --> # I B P WORKINGGR / SR 3.75 &Chapter VIII of BWM S VELRAJ MDTC DWR <!-- Slide number: 2 -->  <!-- Slide number: 3 --> # IBP GENERAL IBP is a class “C” station. It is provided on S/L, D/L & M/L sections. Purpose is to split the lengthy BS into two so as to increase section capacity, to reduce the detentions, to reduce staff, to secure economy and efficiency in the operations. <!-- Slide number: 4 --> Intermediate Block Stop Signal (IBSS) is the Home signal of the station. Minimum equipment of signals for a Class ‘C’ station in MAS is Distant & Home IBSS is controlled by the SM in rear. There are two BLOCK SECTIONS available 1) Station Controlled Intermediate Block Section (SCBS) 2) Block Controlled Intermediate Block Section (BCBS). <!-- Slide number: 5 --> # Indications and Buttons Indications:- K 1 :- When train passes IB Signal at ‘ON” K 2 :- When train passes LSS at ‘OFF’ position K 3 :- When train passes IB Signal at ‘OFF’ position K 4 :- Power fail or when bulb fused at IB Home / Distant In addition to these indications buzzer is also provided. <!-- Slide number: 6 --> # Reset Buttons :- PB 1 :- To reset the AC when train passes IB signal at ‘ON’. PB 2 :- To reset the AC due to failure or improper counting. PB 3 :-To give Co-operation to the station in rear. <!-- Slide number: 7 --> # NORMAL WORKING OF IBP Station Controlled Intermediate Block Section is controlled by Axle Counters or Track Circuits. In case of Axle Counters , One set of AC provided in advance of LSS and other set provided 400m in advance of IB Home Signal. <!-- Slide number: 8 --> LSS is interlocked with AC and IBS signal is interlocked with the Block Instrument. Obtain Line Clear from the advance station. Two PNs obtained (one for Line Clear & one for consent) Ensure AC section is free and take off LSS and IB signal. <!-- Slide number: 9 --> # Normal IBP Working When train passes LSS, AC indication shows occupied and K2 indication appears with buzzer and will be stopped when LSS knob is normalized. <!-- Slide number: 10 --> When train passes IB signal (OFF) , K-3 indication appears with buzzer and will be stopped when IB signal knob or lever is normalized and advance SM turns the handle of BI to TOL position. When train completely passes second axle counter (at 400 m from IBSS) section becomes free. <!-- Slide number: 11 --> Now obtain consent (1 PN) for second train and take off LSS. By the time second train reaches IB signal, first train may clear into advance station and SM will get Line Clear (1 PN) to enter IB section. <!-- Slide number: 12 --> Rear end SM can take off IB signal after taking Line Clear through BI. On S/L (IB Section), first the direction of traffic (DOT) shall be established and then the Line Clear shall be obtained from the block station in advance. After establishing DOT, the train movement in the SCBS shall be permitted. <!-- Slide number: 13 --> # FAILURE OF IBSS When IBSS at ‘ON’, on reaching IBSS, LP to contact SM in rear through telephone provided at the post of IBSS. If it is at ‘ON’ on account of occupation of proceeding train in the B S, SM shall intimate to LP & on clearance of train SM to obtain LC thorough BI and take off IBSS. <!-- Slide number: 14 --> In case of IBSS defective and LC has been obtained through block telephone, SM shall issue a message to LP through SPT supported by a PN. LP to record in RJB. In case of IBSS at ‘ON’ on failure of BI, on obtaining LC from station in advance, SM shall issue a message supported by PN. <!-- Slide number: 15 --> SM when aware of failure of IBSS due to failure of signal itself, BI, TC/AC etc , entire BS treated as one and issue PLCT + T/369-(3b) as authority for trains. If LP on reaching IBSS unable to contract SM in rear through SPT, after waiting for 5 minutes, pass IBSS at ‘ON’ and proceed at a speed not exceeding 15 kmph when view ahead clear and not exceedi
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,233 documents