No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | RBE No. 155/2022 |
|---|---|
| File number | No. PC-VII/2019/RSRP/3(Pt.I) |
| Date | 2022-11-17 |
| Type | NFR Policy |
| Topic | upgradation |
| Currency | Currency not verified |
Upgradation of pay structure of certain cadres under RBE No. 155/2022 dated 17.11.2022 -1(PB-2/GP-4600) is to be upgraded from Level-7 (PB-2/GP-4600) to Level-8 (PB-2/GP-
PC-VII/2019/RSRP/3(Pt.1) '73114278/2025 GOVERNMENT OF INDIA (भारत सरकार) Ministry of Railways (रिल मंत्रालय) Railway Board (रेलवे बोर्ड) PC-VII No. 222 RBE No: °4 /2025 File No. PC-VII/2019/RSRP/3(Pt.I) New Delhi, dated: | .01.2025 The General Manager/CAOs(R), All India Railways & Production Units, (As per mailing list) Sub:- Upgradation of pay structure of certain cadres under RBE No. 155/2022 dated 17.11.2022. Please refer to Board’s letter No. PC-VII/2019/RSRP/3 dated 17.11.2022 (RBE No. 155/2022) regarding upgradation of pay structure of certain Group ‘C’ cadres of Ministry of Railways as per the guidelines mentioned therein. 2. Vide Annexure-II (Point 2) of letter RBE No. 155/2022, it has been stipulated that in Phase-I of the implementation, on the cutoff date, 50% posts of the cadre strength of Level -1(PB-2/GP-4600) is to be upgraded from Level-7 (PB-2/GP-4600) to Level-8 (PB-2/GP- 4800) and in the Phase —II, further upgradation of the 50% of these posts in Level-8 (PB- 2/GP-4800) to Level-9 (PB-2/GP-5400) on non-functional basis after 4 years of service in Level-8 (PB-2/GP-4800). 3. Now, in consultation with Ministry of Finance and with the approval of Competent Authority, it has been decided that percentage and mode of upgradation in Phase-II is to be modified to the extent that after completion of 4 years' service in Level 8, all incumbents in Level 8 are to be upgraded to Level-9 on non-functional basis. The upgradation from Level- 8 to Level-9 is non-functional in nature and the same is to be done for incumbents and not for the posts. Signed by Jaya Kumar G Date: 09-01-2025 11:25:37 : Approved a APE ‘umar G) Joint Director, Pay Commission & HRMS Railway Board e-mail: jaya.kumarg@gov.in Ph. No: 011-47845125 File No. PC-VII/2019/RSRP/3(Pt.1) New Delhi, dated: — .01.2025 Copy (with 40 spares) forwarded to the A.D.A.L, Railways, New Delhi. Signed by Avninder Singh Bhasin For Mewar Finan Balyas doped File No. PC-V11/2019/RSRP/3(Pt.1) New Delhi, dated: —.01.2025 Copy forwarded to :- 1. PFAs All Indian Railways, PUs, NFR(Const)
Open this circular in the search app · Search all 4,233 documents