C
Commercialpedia Indian Railways commercial circulars and policies

Process flow of Train Demand module in PRIMES and ICMS applications of CRIS

· 2025-01-31
Currency not verifiedCircularreservation
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

Open the official PDF on indianrailways.gov.in

Date2025-01-31
TypeCommercial Circular
Topicreservation
CurrencyCurrency not verified
Official PDFindianrailways.gov.in

Summary

‭6.‬ ‭Demand‬‭Processing‬‭by‬‭CPTM‬‭office:‬‭Post‬‭confirmation‬‭of‬‭the‬‭trip‬‭demand,‬‭the‬‭users‬‭have‬‭to‬‭process‬‭the‬‭demand‬‭and‬‭fill‬‭the‬‭required‬

Text of the circular

‭Dated: 31.01.2025‬
‭Process flow‬‭of‬‭Train Demand‬‭module in‬‭PRIMES‬‭and‬‭ICMS‬‭applications of‬‭CRIS‬‭:‬
‭As‬‭per‬‭extant‬‭practice,‬‭to‬‭fulfill‬‭the‬‭extra‬‭rush‬‭(passenger)‬‭demand‬‭on‬‭different‬‭occasions‬‭(e.g.‬‭KUMBH,‬‭Summer‬‭vacation,‬‭Holi,‬‭Deepawali‬
‭etc.),‬ ‭Zone‬ ‭submit‬ ‭their‬ ‭train‬ ‭trip‬ ‭requirements‬ ‭(special‬ ‭trains,‬ ‭TOD)‬ ‭to‬ ‭the‬ ‭Railway‬ ‭Board‬ ‭(RB)‬ ‭for‬ ‭approval.‬ ‭Post‬ ‭RB‬ ‭approval,‬ ‭the‬ ‭zone‬
‭subsequently notify the train services for Public and Railways.‬
‭To‬ ‭streamline‬ ‭this‬ ‭train‬ ‭trip‬ ‭demand‬ ‭creation‬ ‭and‬ ‭submission‬ ‭to‬ ‭RB‬ ‭by‬ ‭zone‬ ‭and‬ ‭then‬ ‭approval/rejection‬ ‭by‬ ‭the‬ ‭RB,‬ ‭Train‬ ‭Demand‬
‭Utility/Module has been developed by‬‭CRIS‬‭- in‬‭PRIMES‬‭and‬‭ICMS‬‭applications respectively for Commercial and‬‭Operating users.‬
‭1.‬ ‭PRIMES‬‭(‬‭Commercial‬‭Users, Zonal CCM/PM office):‬
‭This‬‭utility‬‭helps‬‭to‬‭estimate‬‭the‬‭number‬‭of‬‭train‬‭trips‬‭needed‬‭for‬‭specific‬‭Origin-Destination‬‭(O-D)‬‭pairs.‬‭Users‬‭can‬‭input‬‭historical‬
‭date‬ ‭ranges‬ ‭(for‬ ‭a‬ ‭reference‬ ‭period)‬ ‭and‬ ‭select‬ ‭O-D‬ ‭pairs‬ ‭from‬ ‭options‬‭such‬‭as‬‭Stations,‬‭Clusters,‬‭Zones,‬‭States,‬‭or‬‭Stations‬‭within‬‭a‬
‭specific‬ ‭KM‬ ‭range‬‭.‬ ‭Based‬ ‭on‬ ‭this‬ ‭information,‬‭the‬‭tool‬‭calculates‬‭the‬‭passenger‬‭demand‬‭and‬‭determines‬‭the‬‭required‬‭number‬‭of‬‭trips‬‭to‬
‭accommodate‬ ‭the‬‭rush.‬‭The‬‭utility‬‭also‬‭factors‬‭in‬‭projected‬‭passenger‬‭growth‬‭percentages‬‭for‬‭PRS‬‭and‬‭UTS‬‭between‬‭the‬‭reference‬‭and‬
‭proposed‬‭periods,‬‭as‬‭well‬‭as‬‭the‬‭option‬‭to‬‭set‬‭the‬‭number‬‭of‬‭reserved‬‭passengers‬‭that‬‭a‬‭single‬‭train‬‭can‬‭accommodate.‬‭This‬‭utility‬‭also‬‭takes‬‭the‬
‭unmet demand of live trains into consideration for demand calculation.‬
‭After‬‭providing‬‭these‬‭inputs,‬‭the‬‭application‬‭will‬‭generate‬‭an‬‭estimated‬‭number‬‭of‬‭train‬‭trips‬‭needed‬‭for‬‭the‬‭selected‬‭O-D‬‭pair.‬‭This‬
‭estimated demand is then sent to‬‭ICMS (Operating)‬‭for review and submission to RB for approval.‬
‭2.‬ ‭ICMS‬‭(a.‬‭Operating‬‭Users, Zonal CPTM office, b.‬‭RB‬‭Users):‬
‭CPTM‬‭office:‬‭On‬‭receipt‬‭of‬‭the‬‭trip‬‭demand,‬‭the‬‭CPTM‬‭office‬‭will‬‭manually‬‭exercise‬‭the‬‭operational‬‭feasibility‬‭and‬‭can‬‭accept‬‭/‬‭modify(+,-)‬‭/‬
‭reject‬‭the trip demand count and provide suitable remarks. Here users can view the coach availability‬‭in its territory as present in the system.‬
‭Post‬‭acceptance‬‭of‬‭the‬‭trip‬‭demand,‬‭the‬‭users‬‭have‬‭to‬‭process‬‭the‬‭demand‬‭and‬‭fill‬‭the‬‭details‬‭as-‬‭train‬‭valid‬‭from‬‭-‬‭valid‬‭to‬‭dates,‬
‭Source‬‭station,‬‭Destination‬‭station,‬‭owning‬‭Railway,‬‭Days‬‭of‬‭Run,‬‭SRC‬‭Dep‬‭Time,‬‭Dest.‬‭Arrival‬‭time,‬‭Primary‬‭Maintenance‬‭Station,‬
‭SM‬‭station,‬‭Trip‬‭route‬‭zone‬‭approval‬‭status,‬‭Rake‬‭Type,‬‭Stock‬‭Source,‬‭Coach‬‭Types,‬‭Composition‬‭Class‬‭and‬‭PTT‬‭stoppage‬‭details‬‭etc.‬
‭Users‬‭can‬‭use‬‭multiple‬‭train‬‭profiles‬‭to‬‭fulfill‬‭the‬‭trip‬‭demands.‬‭Post‬‭submission‬‭of‬‭the‬‭trip‬‭details‬‭the‬‭demand‬‭will‬‭be‬‭available‬‭to‬‭RB‬‭users‬‭for‬
‭approval.‬
‭RB‬‭:‬‭On‬‭receipt‬‭of‬‭the‬‭trip‬‭demand‬‭with‬‭details‬‭the‬‭user‬‭can‬‭accept‬‭/‬‭reject.‬‭If‬‭the‬‭stock‬‭source‬‭will‬‭be‬‭RB,‬‭then‬‭RB‬‭has‬‭to‬‭arrange‬‭the‬‭stock‬‭and‬
‭then approve.‬
‭CPTM‬‭office:‬‭Post‬‭approval‬‭of‬‭demand‬‭by‬‭the‬‭RB,‬‭the‬‭demand‬‭ID‬‭generated‬‭initially‬‭in‬‭PRIMES‬‭will‬‭be‬‭sent‬‭to‬‭SATSaNG‬‭application.‬‭Now‬
‭the‬‭CPTM‬‭office‬‭has‬‭to‬‭Notify‬‭the‬‭train‬‭service‬‭manually‬‭as‬‭per‬‭the‬‭extant‬‭practice‬‭in‬‭respective‬‭zones‬‭including‬‭the‬‭PRIMES‬‭Demand‬‭ID‬‭.‬
‭Post‬‭notification,‬‭the‬‭Time‬‭Table‬‭controller‬‭has‬‭to‬‭feed‬‭such‬‭train‬‭services‬‭into‬‭SATSaNG‬‭and‬‭select‬‭the‬‭PRIMES‬‭generated‬‭Demand‬‭ID‬‭for‬
‭reconciliation of the trip demanded, approved and notified.‬
‭It is mentioned that the MIS reports are available to monitor the current demand status in‬‭PRIMES‬‭and‬‭ICMS‬‭.‬
‭1‬

‭Dated: 31.01.2025‬
‭Help Document to use Train Demand Module in ICMS:‬
‭1.‬ ‭Login into Tr

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents