C
Commercialpedia Indian Railways commercial circulars and policies

Pre- NI/ NI working for commissioning of PKD- MKJ section- Reg

· 2024-07-19
Currency not verifiedCirculartrain-services
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2024-07-19
TypeCommercial Circular
Topictrain-services
CurrencyCurrency not verified

Summary

Pre- NI/ NI working for commissioning of PKD- MKJ section- Reg 80024 (Frid NI starts from 07.00 hours, Block- 12.30 hours to 14.30 hours NI

Text of the circular

SOUTH WESTERN RAILWAY लि
OFFICE OF THE PRINCIPAL CHIEF OPERATIONS MANAGER, 2nd FLOOR,

No: T.166/Pre NI/NV/SBC/24. No: T166/PreNINISBCD4. SSCS 25.07.2024
Sr. DOM & Sr. DCM/ SBC, MYS & UBL

Sub: - Pre- NI/ NI working for commissioning of PKD- MKJ section- Reg.

Ref: - Sr. DOM/ SBC Message No. B/T.348/Vol.1/2024 dated 19.07.2024 received at 18.25 hours.

ने के नंद के भेद
With reference to the above, competent authority has approved to take up Prior to Pre NI for 5 days
from 01.08.2024 to 05.08.2024, Pre- NI for 1 day on 06.08.2024 and Non- Interlocked (NI) working for
days from 09.08.2024 to 11.08.2024 at PKD- MKJ section, as per the details mentioned below:-
emarks

4

Date & Da Block Timings and Duration
- 8, 01.08.2024 (Thursday) 12.30 hours to 15.30 hours (180 minutes
- 7, 02.08.2024 (Friday) 12.30 hours to 15.30 hours (180 minutes)

= 6, 05.08.2024 (Saturday)
- 5, 04.08.2024 (Sunday)
0-4, 05.08.2024 (Monday)
D-3, 06.08.2024 (Tuesday)

=)
=
.
.

D- 2, 07.08.2024 (Wednesday) No Block

D=1, 08.08.2024 (Thursday) या CN lok

80024 (Frid NI starts from 07.00 hours, Block- 12.30 hours to 14.30 hours NI
D- Day, 09.08. (Friday) (120 minutes)
Saturd NI continues, Block- 12.30 hours to 14.30 hours ;
D+ 1, 10.08.2024 (Saturday) (120 minutes) N
D+ 2, 11.08.2024 (Sunday) NI continues, Block- 11.30 hours to 17.00 hours (330 minutes)
Coaching repercussions:-
I. Partial Cancellation of train:-
C No of
~-| 06515 SBC- SSPN | 01.08.2024 to 06.08.2024 & | 9 days | Will be Partially Cancelled: between HUP-
MEMU 09.08.2024 to 11.08.2024
९ Will be Partially Cancelled between SSPN-
PN- SB os 7
06516 SS HUP and it will be origindted from HUP
07693 GTL- HUP 3 days | Will be Partially Cancelled between DMM-
DEMU HUP duly short terminated at DMM.
T , 3 days | Will be Partially Cancelled between HUP-
07694 HUP- GIL | 09.08.2024 to 11.08.2024 .
ee instead of HUP at its schedule time of DMM.

~)
एप Ju
(५ २1००

, .08. SSPN duly short terminated भा पाए.
”
E 09.08.2024 to 11.08.2024 व
MEMU instead of SSPN at its schedule time of HUP.
DEMU DMM and it will be originated from DMM

Scanned with CamScanner

Il. Diversion of trains:- Skipping
No. of stoppages
T. No. JCO days
20703 KCG- YPR 03.08.2024, 06.08.2024 DMM- SSPN- PKD- YPR
Vande Bharat Exp. & 11.08.2024
19567 TN- OKHA Exp, पा
il.
222 -
Vande Bharat Exp. Nil
20704 YPR- KCG 11.08.2024 1 da
Vande Bharat Exp. a d Nil
22232 SMVB- KLBG ५ 2024 । बन | YNK- PKD- SSPN- DMM-
Vande Bharat Exp. 11.08. 4 ATP

B. Freight repercussion: - Freight trains to be regulated/ diverted via SSPN during Block period.

2.

fe fe

| # |

|» |

C. OHE repercussion D- 8 to D- 1 and D to D+ 2 (Phase 1)
11. Power Block section from NGM/ SSP to MKJ/ SP
12. Down AC up to NGM road 3 only
13. UP AC up to PKD
14. Elementary section 38002, 04, 06
15. All line supply available at DMM, PKD.

Remarks:-
e During exigencies such as late running, congestion in the section, to avoid crossing at MKJ yard,
trains will be diverted by SSPN during NI period.
e TRO department to ensure crew having LRS in both directions of NGM & SSPN during NI
period.
e During Block period no other Blocks to be permitted in SSPN section.

Note I:
1. As per RB Letter No. 2010/Chg II/24/2 dated 17.02.2021, the worksite may be supervised by

ADRM of the division.
2. Readiness to be ensured by SBC division accordingly as per revised date.

Scanned with CamScanner

Note:

1. ee be cant out as scheduled with proper supervision at an appropriate level by the
N concermed authorities. Ki
2. €cessary instructions to se isan to concerned staff to follow the rules during NI working to
3 al safe movement of trains. : i d i fficials as
- ‘Necessary precautions be taken in maintaining safety in train operations, Nek burst
required round the clock for movement of through trains and avoiding cases of block bursting can
4. Sufficient Number of staff to be inducted for setting, Clamping and padlocking the points during
D of train services.
Division has to plan other works like S&T, Machine 

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,233 documents