C
Commercialpedia Indian Railways commercial circulars and policies

From Sr.DOM/SBC To SMR/SBC,SMR/YPR, SMR/SMVB, PRO/SBC

· 2023-07-07
Currency not verifiedCircularfreight
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2023-07-07
TypeCommercial Circular
Topicfreight
CurrencyCurrency not verified

Summary

2days | Will be Partially Cancelled between MAD-

Text of the circular

दक्षिण पश्चिम रेलवे/5०000 Western Railway

MESSAGE दिनांक/08६«: 10.07.2023

From: Sr.DOM/SBC To: SMR/SBC,SMR/YPR, SMR/SMVB, PRO/SBC,
CHC,CPRC,CCRC,GuardSupr., Com.Cont
Bd-1,I1, 111, 1V CDO, SSE/C&W, AC, TLD, CRS,
CBSR, CTI, Pl, CPSR,G.Enq/SBC&YPR

All SS/SMs-SBC Divn. Sr.DME /Ds|I/KIM
. Sr.DCM, Sr.DME, DEE/TRO/SBC ही
सं./५०: B/T.5/Chg./Cancellation/Diversion/Reschedule/Regulation/23

Reference to CPTM/SWR/UBL message No. T.166/Line Block/SBC/23 dated 07.07.2023,
Competent authority has permitted to take up Line Block and Power Block and suspension of Roads
for Construction of RUB at KM 93/100- 200, 2*5.0*2.85 m RCC box in lieu of LC- 73 MYA Yard from
04.07.2023 to 31.07.2023, as per the details mentioned below:-

Line Block and Power Block and suspension of Roads at MYA Yard:

Date Block Availability | Total Block
S&T [TRD| hrs | period &

Duration
3 3 hrs
hrs

TRD Repercussions

Block
Repercussions:

D-5
11/12.07.2023

UP & DN
23.30-

AC trains not to

PB: X/MYA/A/SS/01
be dealt on Rd- .

Tue/Wed 02.30 || 4.
(180 mins)
D- 4 3 3hrs| UP&DN | ACtrainsnotto | PB: X/MYA/A/SS/01
12/13.07.2023 | hrs 23.30- be dealt on Rd-
Wed/Thu 02.30 4.
(180 mins)
0-3 3 35 |. छ?ि& 0१. | ACtrainsnotto | PB: X/MYA/A/SS/01
13/14.07.2023 | hrs 23.30- be dealt on Rd-
Thu/EFri 02.30 4.
(180 mins)
0-2 3 2.5 UP&DN_ | ACtrainsnotto | pp: X/MYA/A/SS/01
14/15.07.2023 | hrs hrs 00.00- be dealt on Rd-
Fri/Sat 02.30 4.
(150 mins)

D-1
16.07.2023,

Preparation of preliminary works

Sunday
D 6 lhr | 2hrs | 6 UP No Power block section:
Mon/Tue hrs hrs 23.10- movement on | 23208, 23107,
17/18.07.2023 05.10 UP lines Rd- 3 | X/MYA/SS/02 &
(360 mins) | & 4, X/MYA/SS/01
DN No 1. DN AC train up to
23.10- movement on | HNK (1% 4 hours).
03.10 DN lines for 2. UP AC train up to Y
(240 mins) | 1% 4 hours Speed restriction: 20
(23.10- 03.10) | KMPH
hours (Rd-
1&2)

Suspension of | PB: X/MYA/A/SS/01

D+1to D+4 Non Block period acuatexiettohe

18.07.2023 to Rd- 4 UP loop | ei
21.07.2023 line dealt on en
Tue to Fri Speed restriction: 20
KMPH

Power block section:

D+5 2 Hrs UP No
22/23.07.2023 hour Hrs 22.00- movement on | 23208, 23107,
Sat/Sun 07.00 (540 | UP lines Rd- 3 X/MYA/SS/02 &
mins) & 4. X/MYA/SS/01
DN No 1. DN AC train up to
22.00- movement on | HNK (1% 4 hours).
02.00 DN lines for 2. UP AC train up to Y
(240 mins) | 1* 4 hours Speed restriction: 20
(23.10- 03.10) | KMPH
hours (Rd-
1&2)

D+ 6 Rd- 4 will be | ACtrains not | PB: X/MYA/A/SS/01
24.07.2023, pm fit for to be dealt on
Mon Traffic Rd-
4.

D+7 2 hrs DN No PB: 23208 &
25/26.07.2023 hour 22.45- movement on | X/MYA/SS/02
Tue/Wed 04.45 DN lines Rd- DN AC train up to HNK.
(360 mins)
D+ 8 to D+ 11
26.07.2023 to Non Block
29.07.2023
Wed to Sat
D+ 12 1hr | 2hrs
30/31.07.2023 hrs
Sun/Mon

Track will not | KMPH
disturbed on
UP line.

PB: 23208 &
X/MYA/SS/02

DN AC train up to HNK.
Speed restriction: 20
KMPH
PB: 23208 &
X/MYA/SS/02

DN AC train up to HNK.
Speed restriction: 20
KMPH

Suspension of
Rd- 1 DN loop
line

DN
22.00-
07.00

(540 mins)

No
movement on
DN lines Rd-
1&2.

Track will not
disturbed on
UP line.

Rd- 1 will be
fit for
Traffic.

01.08.2023,

1&2. Speed restriction: 20
D+ 13
ie

Tue

D+ 14 e UP&DN_ | Welding of rail joints, ballasting, packing
01/02.08.2023 | hrs hrs 23.30- etc.
Tue/Wed 01.30
(120 mins)
D+15 e UP&DN_ | Welding of rail joints, ballasting, packing
02/03.08.2023 | hrs hrs 00.00- etc.
Wed/Thu 02.00
(120 mins)

D+ 16 UP&DN_ | Welding of rail joints, ballasting, packing
03/04.08.2023 00.00- etc.
Thu/Fri 02.00
(120 mins)
D+17.— UP & DN
04/05.08.2023 00.00- etc.

Fri/Sat 02.00
(120 mins)
D+ 18 UP&DN_ | Welding of rail joints, ballasting, packing
06/07.08.2023 00.40- etc.
Sun/Mon 02.40
(120 mins)

Repercussions:-
A. Coaching repercussions:-
I. Cancellation of trains:-

| TrainNo. sd JCO/ Duration No. of day Remarks
06269 MYS- SMVB Exp. Spl. 22.07.2023 Will be cancelled.

2days | Will be Partially Cancelled between MAD-
MYS duly short terminated at MAD.
22.07.2023

17.07.2023 | 2days | Will be Par

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,233 documents