No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | No.TCR/2205/2020/01/3325397 |
|---|---|
| Date | 2024-10-21 |
| Type | Corrigendum |
| Topic | freight |
Movement of newly manufactured privately owned wagons loaded with commodity Sub: Movement of newly manufactured privately owned wagons loaded with
Corrigendum No. 01 to Rates Circular No. 29 of 2020 भारत सरकार GOVERNMENT OF INDIA रेल मंत्रालय MINISTRY OF RAILWAYS (tat बोर्ड RAILWAY BOARD) No.TCR/2205/2020/01/3325397 Dated: 21.10.2024 महाप्रबंधक सभी क्षेत्रीय रेलवे Sub: Movement of newly manufactured privately owned wagons loaded with commodity. Ref: i) Rates Circular No. 29 of 2020. ii) CCM/FM/ER's letter no. C/144/0/Vol-XX/R-1/Policy dated 17.07.2024. 1. In terms of Rates Circular No. 29 of 2020, instructions have been issued for charging of Empty Haulage Charges on movement of newly manufactured privately owned wagons from the station near the manufacturing unit to the supply/delivery station. 2. The matter has been reviewed and the Competent Authority have decided to charge the movement of newly manufactured privately owned wagons loaded with commodity as under: a. The haulage charges for movement of newly manufactured private owned empty wagons are already notified as per RC.29 of 2020, which are based on Class 100 and on the basis of Designed Tare Weight. ७. In case some empty wagons are loaded with spare parts etc. as in the above case is permitted to be moved, during supply, empty haulage Charges to be levied as per RC.29 of 2020 for all the wagons (loaded and empty) at Class 100 for Designed Tare Weight and in addition the loaded wagons be charged at prescribed Class of the commodity loaded as per PCC at train load/wagon load rates as applicable. c. As per RDSO diagram of BKC wagon, it is advised that the PCC will be 55 tonne; the Designed Tare Weight will be 19 tonne; and the Standard composition for charging at train load will be 43 wagons. d. All other charges to be applicable. 3. This shall be effective for the one time movement of BKC wagons, along with spare material to be loaded in wagons, to Bangladesh. 4. This issues in consultation with Traffic Transportation, Mechanical Engineering Directorates and with the concurrence of Finance Directorate of the Ministry of Railways. e Poh fan आनंद) संयुक्त निदेशक, यातायात वाणिज्य (दर) रेलवे बोर्ड No.TCR/2205/2020/01/3325397 Dated: 21.10.2024 Copy to: 1. Principal Financial Advisor, All Indian Railways. aft 2. Dy. C&AG of India (Railways), Rail Bhavan, New Delhi. Le Ze]? कृते सदस्य (वित्त) रेलवे बोर्ड Rail Bhawan, Raisina Road New Delhi-110001 Page 1 of 2
Open this circular in the search app · Search all 4,025 documents