C
Commercialpedia Indian Railways commercial circulars and policies

Poor Utilization of fund allocated for Upgradation/ Modernization of Infrastructure at good sheds (Umbrella work) under Plan Head 53

No. 2023/TC(FM)/31/02 · 2024-12-31
Currency not verifiedCircularupgradation
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo. 2023/TC(FM)/31/02
Date2024-12-31
TypeFreight Marketing Circular
Topicupgradation
CurrencyCurrency not verified

Summary

Poor Utilization of fund allocated for Upgradation/ Modernization of Infrastructure at good sheds (Umbrella work) under Plan Head 53 Modernization of Infrastructure at good sheds (Umbrella work)

Text of the circular

Milmha.- .£

2023/TC(FM)/31/02
1/3114348/2025
भारत सरकार GOVERNMENT OF INDIA
ta मंत्रालय MINISTRY OF RAILWAYS
(tad बोर्ड RAILWAY BOARD)
रेल भवन, नई दिल्ली -110001
Rail Bhawan, New Delhi - 110001
No. 2023/TC(FM)/31/02, Dated - 401.2028

Eoffice No. - 3441677,

All PCCMs,
Indian Railways

Sub -Poor Utilization of fund allocated for Upgradation/
Modernization of Infrastructure at good sheds (Umbrella work)
under Plan Head 53.

As it is known, a sanction of Rs. 12,000 crores were allocated under
Plan Head 53 - Customer amenities for the umbrella work "Upgradation/
Modernization of Infrastructure at good sheds (Umbrella work 2023-24)',
and Rs. 2,500 crores were allocated for the umbrella work ‘Provision of
parcel & goods shed related facilities on zonal Railways (Umbrella Work
2024-25).

However, it has been observed that, as of 31.12.2024, only 54.59%
of the total allocation has been utilized for the umbrella work
‘Modernization/ Upgradation of Infrastructure at Goods Sheds (Umbrella
work 2023-24)’. Additionally, no funds have been utilized under the work
‘Provision of Parcel & Goods Shed Related Facilities on Zonal Railways’
(Umbrella Work 2024-25). A fund utilization statement for Goods Shed
development works under Plan Head 53 (Umbrella Work) as of 31.12.2024
is enclosed herewith, highlighting the poor utilization of allocated funds.

It is, therefore, requested ’to review the works under these Plan
Heads and take necessary measures to ensure the optimum utilization of
funds, so that improved performance is reflected in the coming months.

Encl - As above.
ut —

(Alok Tripathi)
Exe. Director/Freight Marketing
ee Railway Board

6 ——= \ n\ | Email - tefm.branch@rb.railnet.gov.in

rer a
19. CC6 ceeeesttsiveitsiecettieee
(0 CCIM/FMsecescerceeeevsseonee
[1] Dy. COM/FS..esseccsccessnes

severe (2 SCM/G.ecesscccescoosccccenees

rs ==

Detalls of Goods Shed works under PH-53

Fund Statement Sanctioned detalls
A Sale Pe T

i | NO Of 6, ay taal fae Ast of LAU BA |. /
|

के | पर गा आरा कं
ट

UMB 2024-25 (2500 Cr)

14449 63.4
Ps]
23441 9 39.20

sor | vee] 6) eee बता व
की या कमा of seis] of vos] ef voor of ome] लिया
man] को wos] a] roa} va] ra] | om] or] |_|
| __ 556] | v8] sa] sesor] 9] vooon] of onas] [sao] same] गण

Included work sanctioned but deleted - NCR-01(20,01), NER-01(10.49), SCR-06(105.88), SECR -04(40.49), SER-02(38.05), WCR-01(4.3) and WR-03(7.99)

Balance after Senctioned cost and Proposed cost

Based on actual fuds utilized (sanction only)

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,233 documents