C
Commercialpedia Indian Railways commercial circulars and policies

Amrit Bharat Station Scheme for Indian Railways

No. 2022/GS/Stn. · 2023-01-31
Circulartrain-services

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo. 2022/GS/Stn.
Date2023-01-31
TypeCommercial Circular
Topictrain-services

Summary

Amrit Bharat Station Scheme for Indian Railways The Amrit Bharat Station scheme shall generally be executed through various

Text of the circular

भारत सरकार GOVERNMENT OF INDIA
रेल WATAa MINISTRY OF RAILWAYS
रिलवे aS RAILWAY BOARD)

No. 2022/GS/Stn. Dev.-I/08/70 New Delhi, dated: 31.01.2023

The General Managers,
All Zonal Railways.

Sub: Amrit Bharat Station Scheme for Indian Railways
Ref. : 1. Railway Board letter of even number dated 23.12.2022, 26.12.2022
2. Railway Board’s letter no. 2021/Stn. Dev.-I/08/18 dated 04.05.2022 and
03.10.2022

The progress of station development works has been reviewed at Railway Board and
it has been decided that the works for stations identified for development/feasibility studies
under the instructions issued by Railway Board vide reference (1.) and (2.) above shall be
Carried out under the Amrit Bharat Station Scheme.

The extent of development shall depend upon the phasing of the Master Plan as per
above ref. letters. List of 1275 stations identified so far under the scheme and ref. letters 15
attached herewith.

This issues with approval of Board (M/Infra, M/O&BD, M/F, CRB & CEO).

@)

2D
(Rakesh Ehéudhary)
(Executive Director(SD & Trans.)
Railway Board

No. 2022/Stn. Dev.-I/08/70 New Delhi, dated: 31.01.2023

Copy forwarded for information and necessary action to:
1. The PFAs all Indian Railways.
2. The Principal Directors of Audit, all Indian Railways.
3. Dy. Comptroller and Auditor General of India (Railways), Room No.224, Rail

Bhavan, New Delhi.
(Use
alild3

for Member Finance, Railway Board
Copy to:-

1. PCEs, CCMs, CEEs & CSTEs, DRMs all zonal railways.

2. EDPM, EDF(X)-II, EDF(B), ED/Tele, ED/Signal, ED/EEM, DF(X), DTC(G), DDF(B),
DDF(X)-II, F(X)-II, TG-IV, Tele, Signal, Electrical(G) and Budget Branches Railway
Board.

मद OK KK ने

भारत सरकार GOVERNMENT OF INDIA
रेल मंत्रालय MINISTRY OF RAILWAYS
(<td बोर्ड RAILWAY BOARD)

No. 2021/Stn. Dev.-1/08/18 New Delhi, dated: 04.05.2022
The General Managers, Vice Chairman,
All Zonal Railways. Rail Land Development Authority,

DMRC Building, Ajmeri Gate,

New Delhi.

Sub: Comprehensive instructions for umbrella work of Major Upgradation of
Railway Stations on Indian Railways.

It has been Ministry of Railways’ endeavour to develop/upgrade/modernize railway
stations to provide enhanced and modern facilities to the passengers. Various
developmental schemes viz. Model, Modern, Adarsh Station and Umbrella work
Schemes have been launched over a period of time. These schemes were small and
scattered in nature which, generally, did not involve major architectural planning to improve
the overall aesthetic look of the stations.

2. Consequently, Railway Board reviewed the progress of ongoing works related to
Upgradation/Modernization/Beautification of Railway station buildings under various
schemes/umbrella. As a parallel measure, it has been decided to introduce a new scheme
for Major Upgradation of Railway Stations. The modalities of scheme including
identification/selection of stations, broad objectives, scope of work are as under:

I. Modality of scheme:
Under this scheme, priority will be given to those works which improve the ease of
movement of passengers, their convenience and integration of station with
surrounding areas. The development of identified/selected stations will be taken up
in phased manner over coming years. The scheme will be implemented through
Umbrella works sanctioned from time to time.

NSG-1, NSG-2, NSG-3 category of stations;

Other stations of tourist and pilgrimage importance;

Divisional and Zonal headquarter statlons;

Any other stations with local significance identified with the approval of
Railway Board.

Identification of Railway Stations should be done on priority based on above criteria.
Spatial distribution over States should also be considered while identifying Stations

for development.

aooe

II. Broad objectives:

The new scheme aims at Upgraded stations functioning not just as a place where
people come to board the train, but also’ as a City Centre where various other

ode Oy &

ITT.

h.

business activities such as shopping, lei ;

elsure, meetin

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents