No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | No.2021/W-1/Gen1./Gati |
|---|---|
| Date | 2022-07-27 |
| Type | Commercial Circular |
| Topic | freight |
Newly created Gati Shakti Directorate - Headed by AM / PED (Gati Shakti)
Designed to help the candidates appearing the Appendix 3, LDCE, 70% etc of Railway Accounts Railway Accounts Department Examinations Railway Accounts Department Examinations ▼ ▼ Thursday, August 4, 2022 Gati Shakti Unit & Gati Shakti Directorate GSU - Gati Shakti Units in Divisions Authority: Railway Board Letter No.2021/W-1/Gen1./Gati Shakti dated: 27.07.2022. Click for the Letter Railway Board Letter GSU stands for Gati Shakti Unit Policy Decision has been taken to establish GSUs in all 68 Divisions of Indian Railways Organization structure of GSU at Division Headed by CPM - Chief Project Manager. CPM is under the administrative control of DRM - Divisional Railway Manager CPM post - open to all cadres (except IRPFS - Indian Railways Protection Force Services) If more than two ADRMs are available in the Division - the post of one ADRM will be re- designated as CPM. If having two or one ADRM in the Division, make suitable adjustments in the cadre. Establishment expenditure of GSU's - charged to respective Projects. Officers of Civil Engineering, S&T, Electrical, Traffic & Finance will be posted at GSU Associate Finance for GSU - Sr.DFM of the Division DFM/ADFM along with SSO(A) & other staff - posted exclusively for GSU - Will work under the functional control of Sr.DFM but under the administrative control of CPM/GSU Surveys - GSU RET/PET surveys - henceforth are called Feasibility Study. Undertaking Feasibility Study & Preparation of DPR - Detailed Project Report for the Projects - by GSU's only. Necessary changes in the Engineering Code are being processed separately. Home Home Expenditure to be charged to erstwhile Demand No.02 Finance Concurrence - Sr.DFM Rates - are communicated by the Railway Board from time to time. Processed on IRPSM - Indian Railways Project Sanctions & Management Feasibility study report - examined by the NPG of the Division (NPG stands for Network Planning Group) Dy.COM/Planning/Hqrs - co-opted in NPG Approval of Feasibility Study- DRM Approval for Preparation of DPR - GM DPRs will be prepared by the GSU of the Division only Approved DPRs (by GM) along with the Finance concurrence of GSU at Division (Finance concurrence at Hqrs will not be required) - will be submitted to the newly created Gati Shakti Directorate in the Railway Board. Technical, Administrative & Financial powers of GSUs of the Divisions Analogous to the Officers of the Construction Organisation for the projects. DRM & CPM have powers of CAO/C & SAG officer in Construction for the execution of works of GSU. Proposals requiring the sanction of the Railway Board should be sent directly to the Gati Shakti Directorate with approval of GM and concurrence of associated finance at Division (Not Hqrs) Existing Divisional units dealing with ESPs, SWRs, SIPs, and LOPs shall also assist the GSU. If further assistance is required, it may be arranged through outsourcing. Supervision and Execution of Works - Can use PSSA (Project Supervisors Services Agencies) and PMS as per the need of the Project Also, hire retired Railway supervisors below the age of 65 years with the approval of DRMs - within the overall provisions in the estimates of the projects Air travel outside the Zonal Railways - permitted for Offices & Supervisors - in connection with works - With DRMs approval. Concurrence is not required. Accommodation – In case of shortage, leased accommodation may be provided and house retention is also allowed at the previous place of posting up to one year or scholastic year whichever is earlier. GM nominates one HAG or SAG officer at Hqrs - as Zonal co-ordinator for GSUs in Divisions in that Zonal Railway Gati Shakti Directorate Objects: 1. To bring synergy and to improve efficiency of the system 2. To create additional rail infrastructure 3. Enhance railway market share in country’s cargo loading 4. Reduce logistic cost Headed by AM / PED (Gati Shakti) Report to Member Infrastructure, Railway Board
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,025 documents