No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | No 2015/Environ/6/1 |
|---|---|
| Type | Commercial Circular |
| Topic | ticket-checking |
EnHM wing will manage budget for Housekeeping of Stations
INDIAN RAILWAYS ENVIRONMENT MANAGEMENT VISION To promote Green environment and clean energy while making the Indian Railways a global leader in sustainable mass transport solutions. INDIAN RAILWAYS ENVIRONMENT MANAGEMENT MISSION • To promote energy conservation measures. • To maximize the use of alternate forms of clean energy, thereby minimizing the carbon footprint of Railways. • To provide clean and hygienic environment to customers. • To promote conservation of water and other natural resources. • To march towards zero waste discharge from the major Railway units. • To promote Green build-up spaces and expand tree-cover. • Building in-house capacity to set up an effective Environment Management System. • Noise reduction in Railway operations. FORMATION OF ENVIRONMENT DIRECTORATE IN RAILWAY BOARD • Environment & Kousekeeping Management (EnHM) Dte set up vide Rly Bd’s O.O. No 28 of 15 and O.O. No. 30 of 2015 dtd 08.04.15 • Headed by Advisor directly under CRB • EDs from Civil Engg, Electrical Engg, Mechanical, Traffic & Commercial, Finance and Efficiency & Research directorates to be part of this dte • Monitor performance of ZRs & PUs on: (a) Pollution control (b) Efficiency in consumption of energy (c) Conservation of resources, particularly water (d) Development, production & use of alternative sources of energy (Ref: Rly Bd L/No 2015/Environ/6/1 dtd 07.01.15) REPORTING OF ENVIRONMENT ISSUES TO ENVIRONMENT DIRECTORATE • GMs & CAOs were advised to arrange period compilation on environment issues/actions • By Planning & Efficiency wing on Zonal Railways to be coordinated by SDGM/AGM • By M&P maintenance wing in PUs (Ref: Rly Bd L/No 2015/Environ/6/1 dtd 07.01.15) REPORTING OF ENVIRONMENT ISSUES TO ENVIRONMENT DIRECTORATE Actions requested on (i) Monitoring trend of Consumption of Traction Energy (Electricity & Diesel) (ii) Audit & Accreditation on Environment in Major Work Centers viz workshops, depots/sheds & railway stations (iii) Undertaking Audits on Energy & Water consumption in ‘A’ category consumption centres (iv) Introducing a system of user level (including stations) monitoring of consumption of all types of energy as well as water on monthly basis (v) Identification of ongoing works having positive contribution towards Environment (vi) Annexing a report in MCDO on trends/development on above environmental issues departmentwise (Ref: Rly Bd L/No 2015/Environ/6/1 dtd 07.01.15) FORMATION OF ENHM WING IN ZR • Scope limited to 16 ZRs excluding Metro Rly, Kolkata • ENHM organization to function as a separate and exclusive Wing under the control of GM & CME in ZRs and under DRM & SrDME in Division • No new Gazetted posts to be created for EnHM Wing • Posts from departments undertaking Housekeeping activities like Mechanized cleaning of A1 & A category stations, coaches, pest & rodent control, OBHS and linen managements and petty repairs to be identified, aggregated and transferred to EnHM Wing • JAG in HQ and SS officer in Division exclusively with executive officers below as required • Gaztted posts of EnHM wing may be manned by officers from Mechanical, Traffic/commercial, Engineering & Electrical branches (Ref: Rly Bd L/No 2015/EnHM/06/02 dtd 28.08.15) FORMATION OF ENHM WING IN ZR • Supervisors of all departments hitherto engaged in above activities to be deputed to work exclusively in EnHM wing • Management of Housekeeping activities, wherever outsourced, to be managed by EnHM wing; but wherever being done departmentally to continue as such and transferred to EnHM wing whenever decided for outsourcing • In-charge supervisors of Engg/Mechanical/ Electrical/Traffic & Commercial departments responsible for management of stations & depots to continue inspectorial roles in housekeeping activities besides supervisors of EnHM wing (Ref: Rly Bd L/No 2015/EnHM/06/02 dtd 28.08.15) FORMATION OF ENHM WING IN Z
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,025 documents