Creation of posts for new assets

· 2024-03-31
Currency not verifiedCircularnfr-eauction
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2024-03-31
TypeCommercial Circular
Topicnfr-eauction
CurrencyCurrency not verified

Summary

Creation of posts for new assets significant increase in assets for which adequate manpower is required

Text of the circular

Azad | Ka
Amrit Mahotsav

सतीश कुमार
SATISH KUMAR

अध्यक्ष एवं मुख्य कार्यकारी अधिकारी,
रेलवे बोर्ड
पदेन प्रमुख सचिव, भारत सरकार
रेल मंत्रालय,
CHAIRMAN & CHIEF EXECUTIVE OFFICER,
RAILWAY BOARD

EX OFFICIO PRINCIPAL SECRETARY
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS

DO. No. E(MPP)2024/ 1/26 11th September, 2024

bean Da. Gos,

Sub: Creation of posts for new assets.

As per the existing instruction of Department of Expenditure (DoE),
Ministry of Finance, creation of posts (except crew review in Railways)
requires the approval of Department of Expenditure.

2. Railways has over the last few years witnessed a significant
increase in capital expenditure from rupees 1.48 lakh crores in 2019-20
to 2.62 lakh crores in 2023-24. This capital expenditure is resulting in
significant increase in assets for which adequate manpower is required
for Reliable and Safe Train Operation. These assets will further increase
in coming years considering Railways target of Mission 3000 MT from
current level of 1610 MT in 2013-24, and this 3000 MT is to be achieved
by 2030. For achieving this objective, more trains will have to be run
which requires increased manpower for both train running &
infrastructure maintenance. For better appreciation summary of new
assets created in Indian Railways in past 5 years is attached.

3. Creation of new assets and addition/ construction of new lines in
Railways mandates all parameters especially safety related parameters to
be met for clearance by Commissioner of Railway Safety for safe training
of trains. It may also be appreciated that due to safety requirement, the
outsourcing of these activities is not considered feasible e.g.
maintenance/manning tracks, bridges etc., maintenance of Locos,
Coaches and Wagon, Signaling Maintenance etc.

4. As such, for effective monitoring and execution of different projects,
maintenance of new assets and smooth and safe operation of trains,
there is urgent requirement of additional manpower in Indian Railways.
This requires creation of non-gazetted posts from time to time as per
requirement.

Contd...2/-

Rall Bhawan, Ralsina Road, New Delhl-110 001.
Tel.: 011-23384010, Fax : 011-23381453, Emall : crb@rb.rallnet.gov.in

-2-

5. In view of above it is high time that Ministry of Railways may
therefore be delegated powers to create non-gazetted posts in safety and
essential categories for new assets against equivalent matching value
from vacancy bank on 1:1 basis and wherever equivalent money value on
1:1 basis is not available, then creation should be permitted without any
matching surrender.

WTR bank wishes.

Yours sincerely,

DA: As above /

(Satish Kumar)

Dr. Manoj Govil

Secretary (Expenditure)
Department of Expenditure
Ministry of Finance

North Block

NEW DELHI

_ANNEXURE -1 | RE -1

Summary of Assets created in JR in last 5 years

Department - Signal

ieee Item Unit As on : As on %
31-03-201 31-03-2024 Increase |
1 | Points Nos. 77950 109226 40%
2 Signals Nos. 118183 1512116 28%
3 Track circuits 61365 226667 269%
4 P1/EURR Nos. 5886 6375 12%
9 Automatic Signalling | RKMS 3039 4431 46%
| 6 | IBS Nos. 574 756 32%
7 BPAC Nos. 5363 6058 13%
8 Kavach RKM 250 1465 486%

* In Signalling, Safety, Capacity, enhancement and signaling modernization works such

as Automatic Block Signalling, Kavach, Intermediate Block Signal, Level Crossing Gates
Interlocking with Signals, LTE, IP-MPLS etc., are also undergoing in the existing railway
network.

Now a days, track maintenance is being carried out in mechanized manner for which
there is requirement of S&T staff along with the track machines for optimum
utilization of traffic blocks and machine in effective manner.

Thus additional requirement of S&T staff is envisaged for existing network as well as
additional infrastructure created, due to manifold increase in maintenance efforts and
attention required for assets to ensure safety in train operations.

Department- Telecommunication

%
31-03- Increase

As on
31-03-2019

es ara Expected

Extract shown above; the full text is available in the search app.