# Block Rack Operations
Compiled by : - S Velraj, Inst/Optg
<!-- Slide number: 2 -->

# Block Rake
Means a train carrying wagon for a single destination. The number of wagons constituting a block rake for different types of wagons is notified by railway board.
<!-- Slide number: 3 -->
# Mini rack
Mini rack means a sort rake composed of lesser number of wagons than specified for a block rack.
<!-- Slide number: 4 -->
# Two point rack
This is a freight train carrying wagons destined for two terminals
<!-- Slide number: 5 -->
# Wagon / Rack booking
IR carries the entire gamut of goods, ranging from parcel traffic and small consignments, agricultural products, raw materials like iron ore and petroleum, and finished goods like automobiles.
Over the last few decades, IR has made an effort to move away from small consignments or piece meal freight.
<!-- Slide number: 6 -->
# Block Rakes
Both originating and destination terminal should be notified as either full rake terminal or half rack terminal.
Number of wagons indented must be applicable for standard rake size of block rake.
Train load rates will be granted to payload in the train being a minimum of 1400 tonnes.
<!-- Slide number: 7 -->
# Standard Rake Size
Minimum number of wagons specified for qualifying for block rake.
Those minimum to be loaded by consigner for availing train load rates (or)
Pay load in the rack should be a minimum of 1400 T.
If supplied wagons are less than the specified, then consigner shall load all wagons supplied to avail benefit.
If train load indented not supplied due to railway exigencies, customer shall not be penalized.
<!-- Slide number: 8 -->
# Block Racks
Block rakes where a shipper contracts for an entire rake assigned to carry a shipment.
These are more profitable for IR as the rake does not have to be split up into or amalgamated.
It has an advantage of saving on marshalling time, transit time, and scheduling.
Most of IR's freight revenue now comes from such block rakes carrying bulk goods such as coal or cement.
A typical load (full rake) consists of 40 BCN wagons (2200t).
<!-- Slide number: 9 -->
# Mini Rack ( Half Rake)Concept
Sometimes half loads (mini-rake) of 20 BCN wagons (1100t) are also available for contracts.
Two parties can book a rack to two different destinations which are not 300 KMs away from each other.
<!-- Slide number: 10 -->
# Heavy haulage : CC + Rakes
In late 2004, some of the specifications for wagon loading were modified, so as to allow greater loads to be carried.
For materials such as iron ore, an additional 4t can now be loaded, allowing a BOXN wagon to carry 62t.
The concept of Sumo Rakes over SWR issued under special instructions regarding nominated routes, permissible load etc.
Train loaded with additional permissible tonnage are called sumo rakes.
<!-- Slide number: 11 -->
# Parcel trains
Some dedicated parcel trains have been introduced.
Parcel vans are still used a lot for small consignments; these vans are generally attached to passenger trains.
They used to be more numerous in the past but had been diminishing in importance in the 1980s and 1990s as IR focused on larger loads of freight.
High-capacity parcel vans ('Green Parcel Vans') have been used in special-purpose rakes intended for carrying fruits and vegetables.
The high-capacity parcel van carries 23t as opposed to the ordinary parcel van which carries 18t of goods
<!-- Slide number: 12 -->
# Refrigerated parcel Vans
New parcel vans formed by converting old general passenger stock (GS coaches).
These are being used for transporting cars and other automobiles.
Refrigerated parcel van service is available on a few sections.
The coach, manufactured by RCF, has a maximum allowable speed of 130km/h and has a diesel-powered refrigeration unit that can run for 15 days without refuelling.
Services are expected to be introduced on most major routes.