No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Type | Commercial Circular |
|---|---|
| Topic | reservation |
| Currency | Currency not verified |
Protection of track and issuing caution order in case any vehicle/machinery to work within 6 meter of centre of track but more than 3.5 meter.
<!-- Slide number: 1 --> # Precaution at Work site <!-- Slide number: 2 --> # CLASSIFICATION OF WORKS CATEGORY ‘A’ Normal routine maintenance like packing, fitting renewal, isolated renewal of sleepers CATEGORY ‘B’ Works requiring caution order /OEHS viz. Oiling & greasing of fish plates, bridge painting CATEGORY ‘C’ Dealing with interlocking CATEGORY ‘D’ Involving breakage of road viz. Rail renewal , crossing renewal & ctr <!-- Slide number: 3 --> # MANUAL PACKING Excessive twist on straight / and cant on curves Non attention to approaching train on same or adjacent track, specially at vulnerable locations Infringement to overhead / side structures Lifting / lowering of track. <!-- Slide number: 4 --> # WORKING IN LWR TRACK Know the stress free temperature All maintenance within td + 10 to td – 30. Imposition of SR if rail temperature goes beyond td+20 during consolidation period. During tamping operation on PSC track general lift not more than 50 mm in a stage. Hot weather patrolling Inadequate toe load Improper repairs to rail fracture. <!-- Slide number: 5 --> # DEEP SCREENING Proper sequence Use of wooden block Working temperature Gauge face lubrication for reducing chances of wheel mounting Look out man for protection of labour on all the track In case of BCM impose Caution Order on adjoining track <!-- Slide number: 6 --> # MACHINE WORKING Proper authority Group working of machines Infringement to adjacent track Limited visibility at BCM site Protection of men at adjacent track Limit the slew, lifting <!-- Slide number: 7 --> # Precautions at Construction site  <!-- Slide number: 8 --> # A) Marking of White Line with Lime 6000 mm 150 mm wide line with lime Vehicles can Ply in this area  ### Notes: <!-- Slide number: 9 --> # B) Provision of Barricading 3500 mm Barricading Vehicles can Ply in this area  ### Notes: <!-- Slide number: 10 --> # B) Provision of Barricading Luminous Tape/ Red color OR Nylon Rope 12 mm thick Post (Bamboo/ Steel/ Concrete) 1200 mm 3500 mm Elevation of Barricading ### Notes: <!-- Slide number: 11 --> # Measures to be ensured prior to start of the work Barricading as per design shall be provided in full length of work area. The work site shall be suitably demarcated to keep public and passenger way from work area. 3. Signage boards such as ‘Work in progress’ etc to be provided at appropriate locations to warn public/passengers. <!-- Slide number: 12 --> # Contd. … 4. Contractor’s road vehicle/machinery to ply only between Sunset and Sunrise. In case of emergency night working may be allowed with provision of sufficient light and additional staff. 5. Road vehicle/machines to ply in a way so that these not infringe the line of demarcation. <!-- Slide number: 13 --> # C) Plying of vehicles between 3.5 M and 6 M from Center of Track 3500 mm 6000 mm   150 mm wide line with lime Contractor Supervisor Railway Supervisor   ### Notes: <!-- Slide number: 14 --> # Contd. … All temporary arrangement required to be made during execution of work to be made in such a manner that moving dimensions do not infringe. Protection of track and issuing caution order in case any vehicle/machinery to work within 6 meter of centre of track but more than 3.5 meter. <!-- Slide number: 15 --> # Contd. … In case work is planned to be done within 3.5 meter of center line of running track, ensure that work is done under block protection. <!-- Slide number: 16 --> # D) Plying of vehicles within 3.5 M from Center of Track   1200 M Contractor Supervisor 150 mm wide line with lime Railway Supervisor 3500 mm   ### Notes: <!-- Slide number: 17
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,025 documents