systems i.e. EI modules, VDU or Panel Check the signal wires to the detectors are in alignment & check when the signal is

Text of the circular

भारत सरकार 
रेल मंत्रालय 
रेलवे बोडर् 
भारतीय रेल 
िसगनल इंजीिनयरी िनयमावली 
GOVERNMENT OF INDIA 
MINISTRY OF RAILWAYS 
(RAILWAY BOARD) 
INDIAN RAILWAYS 
SIGNAL ENGINEERING MANUAL 
 
APPENDIX  - I   
(MAINTENANCE SCHEDULES) 
JULY 2021 
जुलाई  - 2021 
पिरिशçट - I 
(अनुरक्षण अनुसुची)

APPENDIX-I 
 
(MAINTENANCE SCHEDULES) 
 
OF 
INDIAN RAILWAYS 
 SIGNAL ENGINEERING MANUAL 
(IRSEM) 
    
 
 
 
 
 
July 2021 
 
 
 
 
 
 
 
 
Published by: 
Indian Railways Institute of Signal Engineering and Telecommunications, Secunderabad 
 
For Government of India, Ministry of Railways (Railway Board), New Delhi

PREFACE TO APPENDIX - I OF IRSEM 
 
1. This Book Contains of Maintenance schedules. They are given numbering such as 
Annexure: 14-MS2, where 14 stands for Chapter number, MS stands for Maintenance 
schedule and 2 indicates that it is second schedule for that Chapter.  
 
2. These schedules shall be followed along with the Railway Board/RDSO/OEM`s latest 
guidelines duly Keeping in Mind spirit of Reliability, Availability, Maintainability & Safety 
and Industry`s Best Practices. 
 
3. These maintenance schedules shall be read in conjunction with relevant provisions in 
concerned Chapter of SEM. 
 
4. Telecommunication & Information Technology related equipments shall be maintained by 
associated Telecommunication staff (Technician/Junior Engineer/Senior Section Engineer) 
in coordination with Signalling staff.  
 
5. Values measured for any equipmentduring maintenance, shall be compared with 
concernedequipment`s parameters as furnished by concerned OEM/RDSO and if such 
values are outside permissible Limits, then corrective action shall be taken to bring them 
within permissible limits. 
 
 
Disclaimer:- Any example given in Appendix I, inadvertently showing any equipment or 
usage of any acronym is only for Technical information/Guidance of signal Engineers & 
Technicians and does not endorse any particular make/Brand.

(i) 
 
Appendix I: Maintenance Schedules of 
Indian Railways Signal Engineering Manual (IRSEM- July 2021) 
S.No 
Contents 
Page 
No 
1. Index 
i-ii 
2. Ready Reckoner of Maintenance Schedules - Technician, Sectional 
JE/SSE, SSE (signal)/Incharge 
iii-v 
3. Chapter 11: Dataloggers & Predictive Maintenance Systems 
 
4. 
Annexure 11-MS1: Datalogger 
1 
5. Chapter 12: Installation, Testing & Maintenance of Mechanical 
Signalling Equipment 
 
6. 
Annexure 12-MS1: Mechanical Signalling 
3 
7. Chapter 14: Level Crossing Gates 
 
8. 
Annexure 14-MS1: Mechanical Lifting Barrier 
12 
9. 
Annexure 14-MS2: Power Operated Lifting Barrier 
13 
10. 
Annexure 14-MS3: Sliding Boom 
16 
11. Chapter 15: Cables 
 
12. 
Annexure 15-MS1: Cable, Cable Insulation Resistance Test Sheet, 
Instructions For Insulation Resistance Testing of 
Signalling Cable 
17 
13. 
Annexure 15-MS2: Earth Leakage Detector (ELD) 
21 
14. Chapter 16: Power Supply Systems for Signalling Installations 
 
15. 
Annexure 16-MS1: Integrated Power Supply System  
24 
16. 
Annexure 16-MS2: IPS with Battery Bank Readings 
26 
17. 
Annexure 16-MS3: Discrete Power Supply 
28 
18. 
Annexure 16-MS4: Conventional Power Equipment (Stabilizer, Charger 
Inverter) with Battery Bank Readings 
31 
19. Chapter 17: Train Detection - Track Circuits & Axle Counters 
 
20. 
Annexure 17- MS1: Track Circuit Test Record Card  
33 
21. 
Annexure 17- MS2: DC track Circuit 
34 
22. 
Annexure 17- MS3: Track  Circuit – AFTC  
36

(ii) 
 
Appendix I: Maintenance Schedules of 
Indian Railways Signal Engineering Manual (IRSEM- July 2021) 
S.No 
Contents 
Page 
No 
23. 
Annexure 17- MS4: Analog (Universal Axle Counter (UAC)) 
38 
24. 
Annexure 17- MS5: Digital Axle Counters (DAC) 
40 
25. 
Annexure 17- MS6: Multi Section Digital Axle Counter (MSDAC) 
43 
26. Chapter 18: Block Instruments, BPAC & IBS Working 
 
27. 
Annexure 18-MS1: Block Instruments (Single Line, Double Line, Push 
Button) 
45 
28. 
Annexure 18-MS2: Block Instrument – Double Line (Lock & Block) 
47 
29. 
Annexure 18-MS3: Tokenless 

Extract shown above; the full text is available in the search app.

Search the whole library

Open this circular in the search app · Search all 4,025 documents