C
Commercialpedia Indian Railways commercial circulars and policies

Shunting Precautions Reg RB

· 2025-02-12
Currency not verifiedCircularfreight
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2025-02-12
TypeCommercial Circular
Topicfreight
CurrencyCurrency not verified

Summary

Clear instructions for shunting movement should be given as per instructions

Text of the circular

भारत सरकार (GOVERNMENT OF INDIA) fF ‘ [x a

Ara mT रेल मंत्रालय (MINISTRY OF RAILWAYS) = Azadi,
beret Spb
shotsav रेलवे बोर्ड (RAILWAY BOARD) Amrit Mahotsav
क्र. 2025/संरक्षा-/3/2/2 नई दिल्‍ली, दिनांक: 11.02.2025
महाप्रबंधक,
सभी क्षेत्रीय रेलवे, और

प्रबंध निदेशक, के.आर.सी.एल और डी.एफ.सी.सी.आई.एल.

विषय: Drive No.17: Special Drive on Shunting Precautions covering all shunting

locations of Indian Railways

A Safety Drive for 15 days has to be launched w.e.f 12.02.2025 covering all
major shunting yards. Shunting should be done strictly following rules in GR 5.13 to
5.21 and associated SRs especially in gradient sections. Zonal Railways are requested to

give special emphasis on the following aspects:

1. Hand signals as per GR 3.58 should be shown in such a manner as to be
clearly visible to the Loco Pilot. There should be no ambiguity.

2. Shunting staff should be counseled thoroughly and educated by Concerned
TI or In-charge SM about the knowledge of hand signals under GR 3.58.

3. Shunting operation should be monitored in accordance with GR 5.13 and the
associated SRs.

4. The Station Master shall see that the shunting of trains or vehicles is carried
on only at such times and in such manner as will not involve danger (GR
5.14).

5. While shunting on falling gradients, all the precautions enshrined in GR5.20
shall strictly be observed.

6. Proper supervision strictly as per SWR and safety rules to be ensured while
performing shunting on rakes and coaches with passengers.

7. Attention should be given to the following aspects:

e In accordance with G& SR 5.14, Shunting should not be done at both

ends of a train at the same time. 7

4
aoe
pps

e Riding on buffer, hand brake, gear or screw coupling of vehicles or on
the cowcatchers of the engine should be avoided.

e Hand shunting by the contractors or traders employees unless
supervised by the Station Master on duty or other responsible railway
staff should be avoided.

e Passing under vehicle during shunting operation should not be done.
e Sheltering under wagons should be avoided.

e Uncoupling the vehicles in motion should be avoided.

e Shortcut methods should not be adopted during the shunting.

8. Clear instructions should be given to the staff conducting shunting including
the train crew.

9. Clear instructions for shunting movement should be given as per instructions
of G&SR.

10. The person, who initially gives instructions for shunting operations, shall not
change instructions and authorize the changing of points etc, unless he has
satisfied himself that shunting operations have been stopped completely and
the staff conducting shunting has been advised of the changes contemplated.

11. The securing of vehicles after shunting should be done carefully as per G&SR
along with all safety measures required for Securing etc.

12. Clamping and padlocking of the points in the route is required to be done as
per G&SR.

13. During un-signaled shunting movement, correct setting and locking of points
is required to be done as per G&SR.

14. Before negotiating the points, Loco Pilot must ensure that all right signal is
exhibited from the concerned points enroute by shunting supervisor/
Pointsman as per extant instructions as an assurance of correct setting and
locking of points.

15. Loco while pushing back in shunting movement on line terminating in Dead
End, train must be stopped 20 meters before the Dead End and then shall
be pushed back cautiously as per G & SR 5.14. /

y,

sane

\S%

ही

—

16. While clearing stable load (whether coaching or goods) wooden wedges,
safety chains shall be removed and hand brakes be released only after taking
load/train on pressure in accordance with extant policy instructions issued
by Board.

17. Stations/ Staff should be equipped with all the standard shunting equipment
like, Banner flag, flags or hands lamps etc.

18. Apart from the points given above, observance and compliance of
rules/instructions as contained in G&SR and SWR during shunti

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents