C
Commercialpedia Indian Railways commercial circulars and policies

Performance Review of Zonal Railways/Pus on 28.06.2021 - Record of Discussion

· 2021-06-28
Currency not verifiedStudy materialfreight
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2021-06-28
TypeNFR Policy
Topicfreight
CurrencyCurrency not verified

Summary

Performance Review of Zonal Railways/Pus on 28.06.2021 - Record of Discussion 104 Trains have lie over for more than 9 hours and 24 trains have lie over of 7-9

Text of the circular

GOVERNMENT OF INDIA/aI<a सरकार
MINISTRY OF RAILWAYS/ रेल मंत्रालय
RAILWAY BOARD/Raa बोर्ड

No.2021/E&R/8(1)/6 New Delhi, Dated: 27" July’ 2021

General Managers,

All Zonal Railways, Production Units
NF (Const.), CORE

DG RDSO, DG NAIR

CMDs/ MDs, Railway PSUs

Sub:-Performance Review of Zonal Railways/Pus on 28.06.2021
- Record of Discussion

KEKKKRKEKREKREEEKKKKEEK

Chairman & CEO and Board Members, took a meeting with all GMs, DG/RDSO,
DG/NAIR & CMDs/ MDs/ CAOs of PSUs through Video Conference (VC) on
28.06.2021. All DRMs also participated in the VC. The same was also addressed by
Hon'ble Minister of Railways.

Record of Discussion of the Meeting is enclosed for kind perusal and necessary
action please.

DA/- As above. (Record of Discussion of the meeting). Ro

=a or!
(Umesh Balonda)

Executive Director
Efficiency & Research
Railway Board

Copy to:

1. | OSD/CRB - for kind information of CRB
2. All Divisional Railway Managers (DRMs)
3. EDCC

Record of Discussion

Performance Review of Zonal Railways/ PUs/ PSUs/ Other units held on 28.06.2021

Item

| Action b

Address by Hon’ble MR

1.2

Hon'ble MR appreciated that Railway employees are doing very good work in
these extra ordinary circumstances and are taking Railways forward. He gave
compliments for achieving highest ever loadings in respective months from
Sept'20 to May'21. This should be continued.

Railways are doing well on freight revenue. At the same time passenger revenue
also has to be increased to around Rs 200 Cr per day in the remaining part of
Financial Year. The number of reserved passengers must be targetted for
increase from 20 lakhs per day to 30 lakhs per day.

Accordingly, more reserved trains must be started and routes on which these
trains can be run must be identified at the earliest following the COVID protocols.
Clone trains to be planned as per the requirements on highly demanding routes.

1.3

Increase in GTKM should also be focussed. Divisions and BDUs must also find
ways for freight transportation over longer distances.

1.4

Good progress is seen in ‘Round the Clock’ working of Goods Sheds (522 out of
1396) and Goods Shed Improvement Works (254 out of 457). Next level of
improvements must be planned including operation of Goods Sheds on PPP
mode.

Wagon turn around needs to be reduced from 4.86 days to 3.5 days. Efforts like
terminal management, infrastructural improvements, electrification,
mechanization of loading/ unloading, more utilisation of DFCs etc must be carried
out to reduce the same.

Right Powering of Trains needs to be ensured for efficiency and safety in train
operations. Higher horsepower locomotives must be produced in greater
numbers.

Parcel segment should also be focussed. Railways should plan and aspire to
achieve Rs 5000 Cr this year.

Punctuality performance is good at 95%. Zones with less than 95% punctuality
(ECoR, ECR, NCR, NFR, SECR & SER) must strive to increase their punctuality
performance, without affecting freight movement.

Railway Electrification target for 2021-22 is 8000 RKm. It must be ensured that

piecemeal electrification is not done and end to end connectivity must be ensured
for operational efficiency.

All Board
Members,
DGs & GMs

CAPEX utilisation has to be outcome based. Critical and Super Critical projects
must be planned ahead for early completion. More projects to be taken up on
EPC for overall cost reduction.

iia Units have to gear up to make for the lost months for production of
rolling stock.

Focus of Railways should be on enhanced utilisation of assets (sweating of
. Planning, Monitoring and maintenance practices of assets to be

Page 1 of 12 —_—

Item

_ Action by |

improved including adoption of modern technology. Also, ensure that 85561

failures are minimized.

Vaccination of all employees and their families must be expedited and should be
completed at the earliest.

Address by Chairman & CEO

Safety continues to be our top most priority. So far only one consequential
accident has taken