Open the third-party archive copy
| Circular number | No.WR-ADI0COMM(8OCB)/1/2020-O/o |
|---|---|
| Date | 2024-12-03 |
| Type | Commercial Circular |
| Topic | uts |
| Archive source | drive.google.com |
Integration of PMS locations with UTS e-Coaching Balance Sheet Sub: Integration of PMS locations with UTS e-Coaching Balance Sheet.
वररिष्ठमंडलवावणिज्यप्ंंध ककणकणयणयवाय, अमदुपुरिण, नरिोड़णरिोड़, अहमदण्णद- 382345 पशशश्चिमरिेवावे,अहमदण्णदमंडलवा, Office of the Sfir. D eivisioiol t Comoeeerci t M l rer, Ahmheeb d b eivisioiol Weoterl R itw y, Ahmebupur , N rob Ro b, Ahmheeb d b-382345. D No.C 548/ADI/Online Balance Sheet(74466) Date:03.12.2024 All UTS Locations – ADI Division. All DCMIs/CMIs – ADI Division. Sub: Integration of PMS locations with UTS e-Coaching Balance Sheet. Ref: HQ’s letter no C 548/2/5/19 B. Sheet(e-file:144576) dated 28/11/2024. Apropos to above, please find enclosed herewith HQ’s letter under reference in connection with integration of PMS locations with UTS e-Coaching Balance Sheet. Sectional CMIs are instructed to ensure integration of PMS with e-coaching balance sheet on priority as advised by HQ so that proper accountal can be affected. This is for kind information and further necessary action please. Encl: As above. (Hafiz Ali Khan) ACM/CHG For, Sr.DCM-ADI. C/ - DCMI/Leasing – For information and to integrate ASV, LCH & GIMB PMS locations. File No.WR-ADI0COMM(8OCB)/1/2020-O/o SR DCM/ADI/WR Headquarter Office, Commercial Dept. Churchgate Mumbai - 400 020. No. C 548/2/5/19 B. Sheet (e-file: 144576) Date: 28.11.2024 Sr.DCM – BCT / ADI / BRC / RTM / BVP Sub: Sub: Integration of PMS locations with UTS e-Coaching Balance Sheet. ****** With reference to the above subject, it is to inform you that the under mentioned PMS locations planned under PPMS (Phase III) have started functioning, but the Integration of these PMS locations with UTS e-Coaching Balance Sheet is still pending. List of PMS locations pending for integration is as under: BCT DIVN: AML,CHM,DRD,NOL,KEB,NWU,PLG,UMR,VGN,BSR,UVD,AN,BIM BRC DIVN: BH, CYI, ANND, AKV, GDA, ND ADI DIVN: ASV, LCH, GIMB RTM DIVN: KUH, COR, DWX, UJN BVP DIVN: MHV, BVC, JND Divisions are requested to ensure that above mentioned PMS locations should generate PMS Balance Sheet on Daily Basis through the PMS module so that Integration of these PMS locations with UTS e-Coaching Balance Sheet can be implemented w.e.f 1st December 2024. The same will be enabled in the system after submission of November-2024 e-Coaching balance Sheet. The Following points to be noted w.r.t. PMS integration in e-Coaching Balance Sheet. 1. Stations must be using the PMS Application for Parcel/Luggage booking. 2. PMS Balance Sheet must be generated on Daily Basis through the PMS module at PMS enabled stations. 3. E-Coaching Balance Sheet will auto-fetch the PMS Balance Sheet data, if above points 1 & 2 are completed at PMS end. 4. If the Balance Sheet is not generated at PMS end, E-Coaching Balance Sheet will display a message "No data available in PMS for the given dates", when option No. 5 PARCEL CASH is selected. 5. After enabling the PMS integration, the LUGGAGE CASH option will not be available. 6. After integration of PMS, locations just have to verify the PMS data in the e-Coaching Balance Sheet after selecting Option No. 5 PARCEL CASH and give confirmation "GET UPDATED PMS SYSTEM DATA[Y/N]" in the PMS Data Entry Form. 7. After PMS integration, manual PARCEL CASH bifurcation will not be allowed. Necessary instruction may please be issued to all concerned. Dy. Chief Commercial Manager (PM) File No.WR-HQ0COMM(UMIS)/1/2021-O/o CCM(PM)/HQ/WR I/646140/2024 353/353 6413838/2024/O/o SR DCM/ADI/WR 301
All unreserved ticketing circulars · Open this circular in the search app · Search all 7,826 documents