C
Commercialpedia Indian Railways commercial circulars and policies

(ii)WCR’s letter No.WCR/HQ/C/G-369/Siding/Shunting charge(E-25348) dt.25.03.2025

No. TC-I/2021/214/efile(3344078) · 2025-05-09
Circularfreight

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo. TC-I/2021/214/efile(3344078)
Date2025-05-09
TypeCommercial Circular
Topicfreight

Summary

Shunting Charge double/multiple Train Engines then double/multiple Train Engines will be utilized and Shunting Charge

Text of the circular

भारत सरकार GOVERNMENT OF INDIA
रेल मंत्रालय MINISTRY OF RAILWAYS
(रेलवे बोर्ड RAILWAY BOARD)

No. TC-I/2021/214/efile(3344078) New Delhi, dt.09.05.2025

Pr. Chief Commercial Manager
WCR

Sub: Shunting Charge
Ref: (i) Rates Circular No.14 of 2009
(ii)WCR’s letter No.WCR/HQ/C/G-369/Siding/Shunting charge(E-25348) dt.25.03.2025

Please refer to WCR’s letter under reference (ii) regarding levy of Shunting Charge in case of Non-
EOL siding.

The guidelines regarding Shunting Charge as per Rates Circular No.14 of 2009, stipulates that
Shunting Charge should be levied as per active use of Train Engine, -

“3.5.2 If a rake is hauled by double/multiple locos of inward train and Train Engine is to be
utilized for shunting purpose, railway should make active use of one Train Engine only and Shunting
Charge should be calculated for one Train Engine only. However, if situation warrants use of
double/multiple Train Engines then double/multiple Train Engines will be utilized and Shunting Charge
should be calculated for double/multiple Train Engines”.

These guidelines hold good and no change is envisaged at present.

SA
(अमितेश आनंद)
निदेशक यातायात वाणिज्य (दर)

रेलवे बोर्ड

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents