No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | No.TC-I/2019/201/6-Part(2) |
|---|---|
| Date | 2020-09-25 |
| Type | Corrigendum |
| Topic | freight |
| Directorate | Traffic Commercial (Rates) |
| Currency | Currency not verified |
Free time for loading of bagged consignment in Open Wagons in the case of freight terminals/sidings/goods sheds/steel plants worked on Engine-on-Load basis terminals/sidings/goods sheds/steel plants worked on Engine-on-Load basis
Corrigendum No. 12 to Rates Master Circular/Demurrage-Wharfage-Waiver/2016/0 a. GOVERNMENT OF INDIA (भारत सरकार) MINISTRY OF RAILWAYS (रेल मंत्रालय) (RAILWAY BOARD रेलवे बोर्ड) No.TC-I/2019/201/6-Part(2) New Delhi, dt.25.09.2020 General Manager All Zonal Railways Sub: Free time for loading of bagged consignment in Open Wagons in the case of freight terminals/sidings/goods sheds/steel plants worked on Engine-on-Load basis Ref: Rates Master Circular/Demurrage-Wharfage-Waiver/2016/0 Please refer to Para 2.5 of Chapter-I of Rates Master Circular under reference regarding free time for loading/unloading of wagonsin the case of freight terminals/sidings/goods sheds/steel plants worked on Engine-on-Load basis. The matter has been reviewed and it has been decided to increase the free time for loading of bagged consignment in open wagons (BOX/BOXN etc.) in the case of freight terminals/sidings/goods sheds/steel plants worked on Engine-on-Load basis from 3(three) hours to 6(six) hours. Accordingly, Para 2.5 of Chapter-I of Rates Master Circular under reference stands modified. These guidelines will be implemented with effect from 01.10.2020 and will remain valid for a period of six months i.e. upto 31.03.2021. All other extant instructions hold goods. This issues in consultation with Traffic Transportation directorate and with the concurrence of Finance directorate of Ministry of Railways. Bra: आय (Atul Kumar) Dy. Director/Rates-I Railway Board No.TC-I/2019/201/6-Part(2) New Delhi, dt.25.09.2020 Copy to: 1. Pr. Financial Adviser, All Zonal Railways 2. Dy.C&AG(Rlys), Room No.222, Rail Bhavan, New Delhi. te 4 wVvo for Member(Finance),/Railway Board No.TC-I/2019/201/6-Part(2) New Delhi, dt.25.09.2020 Copy to: 1. Pr. Chief Commercial Manager, all zonal railways 2. Pr. Chief Operations Manager, all zonal railways 3. Managing Director, CRIS, Chanakyapuri, New Delhi-21. 4. Chief Admn. Officer, FOIS, Camp: CRIS, Chanakyapuri, New Delhi. 5. MD, KRCL, Belapur Bhavan, Sector-11, CBD Belapur, Navi Mumbai-400614. 6. Director General, National Academy of Indian Railways, Vadodara. 7. General Secy., IRCA, New Delhi. 8. Director, IRITM, Vill-Kanausi, Manaknagar, Lucknow-226011 Wh? wt Dy. Director/Rates-I Railway Board Copy for information: CRB, M(O&BD), M(Fin), Railway Board AM(T), AM(C), PED(TT/M), PED(A/c), PED(Vig.), EDTC/R, ED(CC), ED(PG), EDTT(S), EDTT(F), ED(Coal), EDFC, EDVT, OSD/MR, Railway Board TC(R), TC(CR), F(C), Safety Branches, Railway Board
Open this circular in the search app · Search all 4,233 documents