C
Commercialpedia Indian Railways commercial circulars and policies

Ref Board’s letters of even number dt.8.3.2007 and dt.24.1.2008

No.TC-1/2005/201/2 · 2007-03-08
Historical — likely supersededCircularfreight
Historical — likely superseded. This circular predates 2020 and has probably been replaced. Treat it as a record of what the rule was, not what it is. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo.TC-1/2005/201/2
Date2007-03-08
TypeCorrigendum
Topicfreight
CurrencyHistorical — likely superseded

Summary

Wharfage rules | Group II 15 working hours from the expiry of free time for unloading of

Text of the circular

Corrigemdsum No.3 to Rates Circular No.21 of 2007

Government of India i
Ministry of Railways
(Railway Board) |
No.TC-1/2005/201/2 Pt.B ं ः New Delhi, dt. "7 .9.2009
GM(Comml.)
All Indian Railways
Sub: Wharfage rules |

Ref: Board’s letters of even number dt.8.3.2007 and dt.24.1.2008

References have been received from Zonal Railways recommending change |
in certain provisions of Rates Circular No.21 of 2007. ं

The matter has been examined and it has been decided to revise Paras 2.2 &
3.3 and to insert an additional Para 2.21 in Rates Circular No.21 of 2007, as under: |

. "2.2 Classification should be reviewed every year in the month of May on the basis of .

‘average number of rakes dealt with per month during 1 January to 30" April’

__ or.'the average number of rakes deait with per month during 1" May(of previous —

year) to 30% April’ whichever is higher. The same. should be notified for the _ |
period July to June.” “Se 7 7 a

"2.2.1 There may be cases where traffic pattern changes and railway administration ~~

“31 Free time for removal of goods from railway premises will be as under:

(a) Goods stacked in goods sheds etc. waiting to be loaded in wagons/rake

GroupI 12 working hours from the expiry of free time for loading of

wagons/rake . . a

Group IT 15 working hours from th

_ wagons/rake .

_ Group IIT 30 working hours from the expiry of free time for loading of
wagons/rake oS a

€ expiry of free time for loading of

Corrigendum No.3 to Rates Circular No.21 of 2007

(b) Goods unloaded from wagons/rake waiting to be removed from goods shed की
etc. OO

GroupI 12 working hours from the expiry of free time for unloading of
wagons/rake

Group II 15 working hours from the expiry of free time for unloading of
wagons/rake

Group ITI 30 working hours from the expiry of free time for unloading of
wagons/rake

This issues with the approval of Traffic Transportation Directorate and
_ concurrence of Finance Directorate of Ministry of Railways .

. ः (N.K,. Parsuramka)
Director Traffic Comml.(Rates).
. Railway Board

~ No.TC-1/2005/201/2 Pt.B New Delhi, dt. 7 .9.2009
, कि

1. BA&CAOs, All Indian Railways _
2. Dy.C&AG(Rlys), Room No.222, Rail Bhavan, New Delhi

For Financial Commissioner, Railways

2005/201/2 Pt.B | New Delhi, dt.7. .9,2009

~. Managing Director, CRIS Chanakyapuri, New Delhi-21
_ कै. Chief Admn. Officer, FOIS, N. Rly., Camp: CRIS Chanakyapuri, New Delhi-21
3. General Secy., IRCA, New Delhi
4. Secretary, RRT, 5, Dr. P.V. Cherian Crescent Road Egmore, Chennai-600105
5. Director General, Railway Staff College, Vadodara
6. Director, IRITM, Campus: Hardoi Bye-pass Road Vill-Kanausi, P.O.-Manaknagar, Lucknow-
226611 —— गण
7, Chief Commissioner of Railway Safety, Lucknow Que .

_ (N.K, Parsuramka) »
Director Traffic Comml.(Rates)
Railway Board .

MT, FC, Railway Board | a | : 7
(©), AM(T), AM(T&C), AM(C&IS),  Adv(F) Adv(Infra), Adv(Safety), Adv(R),
__ Adv(Mktg.&Logistics), Adv(CC), EDPG, EDFM, EDPM ED(T&C), EDTI(M), EDTT(S),. .
_- EDTI(F), EDFC, EDVT, ED(S&E), ED(Pig), ED(PPP), ED(PP), DTC(G), DPM, DirfT&C)
DFM, DFC,DDTC(R), Railway Board

~ TCR), TC(CR), F(C), Safety Branches, Railway Board —

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,233 documents