No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | No.TC-1/2002/214/5 |
|---|---|
| Date | 2025-07-14 |
| Type | Commercial Circular |
| Topic | freight |
| Currency | Currency not verified |
All India Engine Hour Cost(AIEHC) for recovery of Siding and Shunting Charges introduction of revised Siding and Shunting Charges.
Rates Circular No.09 of 2025 भारत सरकार GOVERNMENT OF INDIA रेल मंत्रालय MINISTRY OF RAILWAYS (रेलवे बोर्ड RAILWAY BOARD) No.TC-1/2002/214/5 Pt.A(3318949) New Delhi, dt.14.07.2025 General Manager All Zonal Railways Sub: All India Engine Hour Cost(AIEHC) for recovery of Siding and Shunting Charges Ref: Rates Circular No.14 of 2024 Ministry of Railways have decided to revise the All India Engine Hour Cost (AIEHC) for recovery of Siding and Shunting Charges, w.e.f.15.08.2025, as under- 2.0 Revised Rates ype of Cost per hour e llocomotive/en: Broad Gauge(BG Meter Gau: G Diesel locomotive hunting Engine 210620 rain Engine 217560 214770 Electric locomotive rain Engine 215440 3.0 Costs to be recovered for steam locos wherever in use over Indian Railways shall be identical to that of Diesel Engines indicated above. 4.0 These revised costs will remain in force until further orders. 5.0 Rounding off of shunting period would continue to be done as per instructions laid down in Para 3.6 of Board’s letter No.TC-I/2008/214/1 dated 06.02.2009(Rares Circular No.14 of 2009, and as amended from time to time). 6.0 Action may please be taken to give due notice to the siding owners before introduction of revised Siding and Shunting Charges. 7.0 The afore-mentioned instructions will also be applicable for Indo-Nepal Traffic. 8.0 This issues with the concurrence of Finance Directorate of Ministry of Railways. ८ Ds ee आनंद) वाणिज्य (दर) रेलवे बोर्ड
Open this circular in the search app · Search all 4,233 documents