Open the third-party archive copy
| Circular number | No. 2020/TC(FM)/11/12-Pt.1 |
|---|---|
| Date | 2020-09-04 |
| Type | VCRC archived Railway commercial circular / manual |
| Topic | parcel |
| Archive source | vcrc.in |
Ensuring basic minimum infrastructure at Parcel-handling locations/ terminals safety and security of Parcel consignments (before loading and after unloading) shall be
भारत सरकार GOVERNMENT OF INDIA रेल मंत्रालय MINISTRY OF RAILWAYS (रेलवे बोर्ड RAILWAY BOARD) रेल भवन, नई दिल्ली-110001 No. 2020/TC(FM)/11/12-Pt.1 Rail Bhavan, New Delhi – 110 001, dated 04.09.2020 Principal Chief Commercial Managers, All Zonal Railways. Sub: Ensuring basic minimum infrastructure at Parcel-handling locations/ terminals. ***** It has been noticed that stations/terminals handling significant amount of Parcel traffic also lack the basic facilities for safety and security of consignments – which acts as a major disincentive for potential customers from accessing our Parcel services. To overcome this handicap, it is desired that availability of required infrastructure to ensure safety and security of Parcel consignments (before loading and after unloading) shall be ensured, which may include: 1. Shed (low-cost) to protect consignments from sun and rain, 2. Fencing to prevent unauthorized entry of anti-social elements and stray animals, 3. Adequate lighting, and 4. Facilities for labour (resting place with shed, drinking water arrangement, tap for bathing, etc). Please ensure compliance, and action taken in this regard may be intimated to Board. This has the approval of Competent Authority. 4/9/2020 (Mudit Chandra) Director Freight Marketing Railway Board.
All parcel traffic circulars · Open this circular in the search app · Search all 7,826 documents