C
Commercialpedia Indian Railways commercial circulars and policies

Running of trains in the CLR-QLM Ghat section

No. 2018/CEDO/ORI/01 · 2025-01-16
Currency not verifiedStudy materialticket-checking
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Circular numberNo. 2018/CEDO/ORI/01
Date2025-01-16
TypeCommercial Circular
Topicticket-checking
CurrencyCurrency not verified

Summary

Running of trains in the CLR-QLM Ghat section Sub: Running of trains in the CLR-QLM Ghat section.

Text of the circular

दक्षिण पश्चिम रेलवे
SOUTH WESTERN RAILWAY

क्षेत्रीय प्रधान कार्यालय/ 2०791 Headquarters Office,
परिचालन विभाग/ Operating Department,
Gala तल, पूर्व खंड/2"९ floor, East Block,
गदग रोड़ /Gadag Road,
हुब्बल्लि /Hubballi-580 020.
No: T.157/Ghat Section/CLR-QLM/Vol.V/8 दिनांक/ Date: 16.01.2025.

Sr.DOM/UBL

Sub: Running of trains in the CLR-QLM Ghat section.
Ref: 1. Sr.DOM/UBL letter No. H/T.195/Ghat/CLR-QLM/25, dated 13.01.2025.
2. RB letter No. 2018/CEDO/ORI/01, Dated 09.02.2024.

मं के मे के ok

With reference to the above, the Competent Authority has approved for running of
UP passenger train can follow an UP Goods train with separation of two block
sections in Kulem- Castle Rock section, as a temporary measure on trial basis for a period
upto 31.03.2025.

Division should ensure that the functionality of Slip sidings and Dead ends in Ghat
section is jointly certified by Sr.DEN and Sr.DSO to be in sound condition to safeguard
safety of train in eventuality of rolling down within this trial period. Conformation on the
same may be obtained from DRM. Division may implement the modified working as
sanctioned by Railway Board, duly following the conditions mentioned in the Railway
Board letter cited under ref-2, and it is also requested to work out additional paths, that can
be generated with this relaxation and advise this office.

This issues with approval of PCOM.

atl > \eTarlas
ogish S. Japati)

Assistant Transportation Manager/Rules&Plg
For Chief Traffic Planning Manager

Copy to: Secy to GM- for kind information of GM.