No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Circular number | No. 2018/CEDO/ORI/01 |
|---|---|
| Date | 2025-01-16 |
| Type | Commercial Circular |
| Topic | ticket-checking |
Running of trains in the CLR-QLM Ghat section Sub: Running of trains in the CLR-QLM Ghat section.
दक्षिण पश्चिम रेलवे SOUTH WESTERN RAILWAY क्षेत्रीय प्रधान कार्यालय/ 2०791 Headquarters Office, परिचालन विभाग/ Operating Department, Gala तल, पूर्व खंड/2"९ floor, East Block, गदग रोड़ /Gadag Road, हुब्बल्लि /Hubballi-580 020. No: T.157/Ghat Section/CLR-QLM/Vol.V/8 दिनांक/ Date: 16.01.2025. Sr.DOM/UBL Sub: Running of trains in the CLR-QLM Ghat section. Ref: 1. Sr.DOM/UBL letter No. H/T.195/Ghat/CLR-QLM/25, dated 13.01.2025. 2. RB letter No. 2018/CEDO/ORI/01, Dated 09.02.2024. मं के मे के ok With reference to the above, the Competent Authority has approved for running of UP passenger train can follow an UP Goods train with separation of two block sections in Kulem- Castle Rock section, as a temporary measure on trial basis for a period upto 31.03.2025. Division should ensure that the functionality of Slip sidings and Dead ends in Ghat section is jointly certified by Sr.DEN and Sr.DSO to be in sound condition to safeguard safety of train in eventuality of rolling down within this trial period. Conformation on the same may be obtained from DRM. Division may implement the modified working as sanctioned by Railway Board, duly following the conditions mentioned in the Railway Board letter cited under ref-2, and it is also requested to work out additional paths, that can be generated with this relaxation and advise this office. This issues with approval of PCOM. atl > \eTarlas ogish S. Japati) Assistant Transportation Manager/Rules&Plg For Chief Traffic Planning Manager Copy to: Secy to GM- for kind information of GM. PCE/SWR, PCSO/SWER- for kind information. DRM/UBL- for kind information.
Open this circular in the search app · Search all 4,025 documents