CommercialPedia Indian Railways commercial circulars and policies

AIR CONDITIONING OF IT CENTRES

No.2002/Blect(GY/150/9
Circularreservation
Third-party archive sourceThis copy is useful for discovery but is not labelled as an official Railway publication.Text extraction: ocr (scanned)

Open the third-party archive copy

Circular numberNo.2002/Blect(GY/150/9
TypeVCRC archived Railway commercial circular / manual
Topicreservation
Archive sourcevcrc.in

Summary

Air conditioning of IT centers The five main 5 servers for PRS are at New Delhi, Mumbai CST, Chennai,

Text of the circular

WATE fs

No.2002/Blect(GY/150/9 Pt.

\_ Fhe General Managers gz [Kole All Indian Railways ce iS

AQ OG

Sub: Air conditioning of IT centers.

References five been received from field units seeking guide dies

, regarding air.conditigning of IT, centers 1.6. PRS, UTS, FOIS & Col (renained

as ICMS) etc. The matter has been reviewed and in supercession of all previou

instructions, it has been decided to Jay down the following policy in respect of ait conditioning of IT centers :-

A) PRS & UTS Systems:

}. The five main 5 servers for PRS are at New Delhi, Mumbai CST, Chennai, 7 Kolkata & Secunderabad and nine main servers for UTS are at New

és (८ Delhi, Mumbai CST, Chennai, Kolkata (2 Nés.), Secunderabad, Hajipur है = Gorakhpur. These installations will be air conditioned e

ww L’ oe rac न ः पल _ val yd ee! 2. PRS and UTS centers having ten_or more counters will have ab

D conditioned equipment room (housing routers, switches etc.) and operator’s. room (having ECR, booking clerks etc.). Other PRS & UT!

centets will not be air conditioned

As.a rule, booking counter area for the public will not be atr conditioned Air-vonditioning already provided wm passenger area It larue ointray need not be disturbed and. shall continue

tes

w

S Lerd on--S-10 B. - FOXS/COIS (renamed ICMS), CMS, COA

= | । 1) Main servers for all these applications are located in CRIS/New Death

ORG which is air conditioned.

Cire . | CELE 2) FOIS terminals in control office are already in air अनार CESE environment.

CEGE दर पल 3) Terminals provided at way side locations will not be air conditioned | SE सका गए i

ees

CEE/CON— BEE/Pig MO-

C) Communication Ibaks:-

It has beed planned to establish communication hubs with nseworthe equipments for unification of PRS & UTS network in future. Locations of major hubs requiring air conditioning shall be advised by S&T binant in consultation with Electrical Dte

§dnd: wiren! पु) nag dae, एप नौ * be Jon th

e of the Mintstry or

This issues with the CGONCUPeRCE of Finance Liveclarale 0 Railways.

Please acknowledge receipt.

ga. Glos pe (RAK. Jain) @: fate gf wd gad quant: (ih wai 7 Railw ay Board Sree 87 Thy GAGS, an .

No.2002/Flect(Gy/150/9 Pt \ New Delhi, ot.25.09.00 Copy to: 1 CEEs/All Indian Railways CCMs/ All Incian Railways |

3. CSTEs/ All Indian Railways ं नि हि न FAs CAOS, All Indian Railways agape" न VY ¥ i 4 | Dir Blec EMBE (} : Railway Bost a

New Delhi fa 24% 09 0G

wl 200? लव (रो पु 9 हि

कि =e = ~ = aa e — \ ~— La

nin

J

के थी 2 CE भी. o 7 2 हि 4 c « । हू) ह+ Td है sd

More on this subject

All reservation circulars · Open this circular in the search app · Search all 6,739 documents