C
Commercialpedia Indian Railways commercial circulars and policies

दक ष ण पश च म Lera/South Western Railway

· 2024-12-13
Study materialfreight

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

Date2024-12-13
TypeCommercial Circular
Topicfreight

Summary

Line Block and Power Block between NTR- SPGR at LC No.

Text of the circular

दक्षिण पश्चिम Lera/South Western Railway

MESSAGE दिनांक/081€: 16.12.2024

From: Sr.DOM/SBC To:SMR/SBC,SMR/YPR, SMR/SMVB, PRO/SBC, CHC,CPRC,CCRC,GuardSupr., Com.Cont Bd-1, 11,111, IV CDO, SSE/C&W, AC, TLD, CRS, CBSR, CTI, Pl, CPSR,G.Eng/SBC&YPR All SS/SMs-SBC Divn. Sr.DME /DsI/KIM Sr.DCM, Sr.DME, DEE/TRO/SBC, DEE/Gnl.

W./No: B/T.5/Chg./Cancellation/Diversion/Reschedule/Regulation/24

Reference. to CPTM/SWR/UBL message No. T.166/Line Block/SBC/24 dated

13.12.2024, Competent authority has: permitted to take up Line Block and Power Block for insertion and removal of temporary girder for RUB work of LC- 64 at KM 105/ 400- 500 bet NTR- SPGR (in this shadow Block replacement of stone slab with RCC boxes Block will

be taken simultaneously at KM 60/ 900- 61/ 000 at Bri- 324 on UP & DN line between HHL- KDAG), as per the details mentioned below:-

Line Block and Power Block between NTR- SPGR at LC No. 64:- SI. Line Block Timings Activit Insertion of Tem i .00 porary 02.01.2025 09.00 hours to 16.0 , DN

Girder on UP & DN line at

(Thursday) a KM 105/ 400- 500 (420 minutes) .

Insertion of RCC boxes by UP & 05.01.2025 08.40 hours to 09.40

2. crane on UP & DN line at DN (Sunday) hours KM 105/ 400- 500 (60 minutes) Insertion of RCC boxes by 05/ 06. 01.2025 | 22.30 hours to 01.30 crane on DN line at KM 105/ (Sunday/ hours 400- 500 Monday) (180 minutes) Insertion of RCC boxes by 06.01.2025 |: 02.30 hours to 05.30 crane on UP line at KM 105/ (Monday) hours 400- 500 (180 minutes) Insertion of RCC boxes by 06/07. 01.2025 | 23.00 hours to 02.00 crane on DN line at KM 105/ (Monday/ hours 400- 500 . Tuesday) (180 minutes) Inse rion or RCC senor ; 07. 01.2025 02.30 Be ley 05.30 crane on inea 400- 500 ella (180 minutes) Removal of Temporary 09. 01.2025 09.00 hours to 16,00 Girder on UP & DN line at (Thursday) hours KM 105/.400- 500 (420 minutes)

02.30 hours to 05.30 Rail Renewal & Welding 11. 01.2025 hours work at KM 105/ 400- 500 (Saturday)

(180 minutes)

02.30 hours to 05.30

Rail Renewal & Welding 12. 01.2025 hours work at KM 105/ 400- 500 (Sunday ) (180 minutes)

12/ 13 01.2025 22.30 hours to 01.30

Rail Renewal & Welding (Sunday/ hours work at KM 105/ 400- 500 Monday) (180 minutes) 13/14. 01.2025 | 22.30 hours to 01.30 Rail Renewal & Welding (Monday/ hours work at KM 105/ 400- 500 Tuesday) (180 minutes)

Note 1: - Block for replacement of stone slab with RCC boxes will be taken simultaneously at KM 60/ 900- 61/ 000 at Bri No. 324 on UP & DN line between HHL- KDAG.

Repercussions:-

A. Coaching repercussions:-

Il. Cancellation of trains:-

__ T..No.

07346 TK- CMNR Pass. | ow | 07328 CMNR- ws Pass. up | 16239 CMGR- YPR Exp. | ow | 16240 YPR- CMGR Exp. UP ow | “too | ono

Zn o-

r=

Ww

Will be Cancelled.

Sa)

days

N UP

02.01.2025 & 06576 TK- SBC MEMU 09.01.2025

02.01.2025 & 06575 SBC- TK MEMU UP - 09.01.2025

02.01.2025 & 16579 YPR- SMET Exp. 09.01.2025

02.01.2025 & 16580 SMET- YPR Exp. on | 09.01.2025

Note II: - The Cancelled rake of train No. 07346 TK- CMNR Pass. JCO 02.01.2025 and 09.01.2025 to be moved as empty to MYS after the Block.

7.

Il. Partial Cancellation of train:-

Remarks

06571 2 | Will be Partially Cancelled between SBC- TK MEMU days | HHL- TK duly short terminated at HHL.

d between TK-

ही ially Cancelle Will be Partially ted from HHL

02.01.2025

06572 & HHL and it will be origina es hae 09.01.2025 at its schedule departure time.

02,01,202° Will be Partially Cancelled nee

- duly short terminated at .

09.01.2025 ASS SEG-Culy

02.01.2025 2 Will be Partially Cancelled cs अन UP & SBC- ASK and it will be originated trom SBC- 7 ee 09.01.2025 Hays ASK at its schedule departure time._

02.01.2025 Will be Partially Cancelled between —& ASK- SBC duly short terminated at ASK DWR- SBC Exp. 09.01.2025 and empty rake to be moved to MYS to

pick up its schedule link.

Will be Partially Cancelled between TK- HHL and it will be originated from HHL at its schedule departure time. Empty rake of Train No. 06201 TK- YPR MEMU to b

Extract shown above; the full text is available in the search app.

More on this subject

All freight circulars · Open this circular in the search app · Search all 4,226 documents