C
Commercialpedia Indian Railways commercial circulars and policies

Railways approves survey for

Currency not verifiedStudy materialnfr-eauction
Currency not verified. Nobody has confirmed whether this circular is still in force. Check the present position before relying on it. The official Railway Board PDF always prevails over anything shown here.

No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.

TypeCommercial Circular
Topicnfr-eauction
CurrencyCurrency not verified

Summary

coach washing lines, 24 stabling lines, heavy repair bays, wheel lathe lines, sick lines,

Text of the circular

Railways approves survey for
mega terminal at Devanahalli to
decongest Bengaluru’s rail
network

‘The terminal is expected to be located along the Yelahanka—Devanahalli—

Chikkaballapur corridor and will serve as the city’s fourth major coaching
terminal

Published - May 09, 2025 09:46 pm IST - Bengaluru

‘THE HINDU BUREAU

Atrain on the Bengaluru-Chickballapur line near Devanahalli. | Photo Credit: ANIL KUMAR SASTRY

To address congestion in Bengaluru’s railway infrastructure, the Railway Board has
approved a final location survey (FLS) for a proposed mega coaching terminal near
Devanahalli.

According to a release by South Western Railway (SWR), the survey, sanctioned at an
estimated cost of 21.35 crore, is a strategic initiative aimed at decongesting Bengaluru's
saturated railway infrastructure and meeting the rising demand for passenger services
in the region.

The terminal is expected to be located along the Yelahanka—Devanahalli-Chickballapur
corridor and will serve as the city’s fourth major coaching terminal, stated the release.

Explaining the need for the terminal, SWR said that with a population of around 115
million, Bengaluru ranks as India's fifth most populous metro. “Its railway system
currently operates with just three terminals and 12 pit lines, handling 140 originating,
139 terminating, and 142 pass-through trains daily, along with 110 primary maintenance
trains. In 2024-25, the city is witnessed 103.72 million originating passengers and a
total footfall of 212.06 million. Existing terminals - KSR Bengaluru, Yeshwantpur, and
SMVT Bengaluru —are already stretched, and future projections of 210 originating
trains per day could overwhelm the system,” the release added.

Current constraints

“The network faces multiple operational bottlenecks: fully utilised pit lines,
overcrowded platforms, frequent train delays, high empty rake movements owing to
insufficient stabling lines, and no dedicated goods corridor. Urban density has made
expansion at existing sites nearly impossible. While short-term steps like train
rerouting and terminal shifts have been implemented, long-term solutions are crucial,”
the release said.

‘The Devanahalli terminal will be a full-fledged facility with 12 pit lines, five automatic
coach washing lines, 24 stabling lines, heavy repair bays, wheel lathe lines, sick lines,
and other supporting infrastructure including loco bays and administrative facilities. It
will be designed to handle 36 rakes per day, according to release.

Published - May 09, 2025 09:46 pm IST

Search the whole library

Open this circular in the search app · Search all 4,025 documents