No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Date | 2023-07-07 |
|---|---|
| Type | Commercial Circular |
| Topic | freight |
2days | Will be Partially Cancelled between MAD-
दक्षिण पश्चिम रेलवे/5०000 Western Railway MESSAGE दिनांक/08६«: 10.07.2023 From: Sr.DOM/SBC To: SMR/SBC,SMR/YPR, SMR/SMVB, PRO/SBC, CHC,CPRC,CCRC,GuardSupr., Com.Cont Bd-1,I1, 111, 1V CDO, SSE/C&W, AC, TLD, CRS, CBSR, CTI, Pl, CPSR,G.Enq/SBC&YPR All SS/SMs-SBC Divn. Sr.DME /Ds|I/KIM . Sr.DCM, Sr.DME, DEE/TRO/SBC ही सं./५०: B/T.5/Chg./Cancellation/Diversion/Reschedule/Regulation/23 Reference to CPTM/SWR/UBL message No. T.166/Line Block/SBC/23 dated 07.07.2023, Competent authority has permitted to take up Line Block and Power Block and suspension of Roads for Construction of RUB at KM 93/100- 200, 2*5.0*2.85 m RCC box in lieu of LC- 73 MYA Yard from 04.07.2023 to 31.07.2023, as per the details mentioned below:- Line Block and Power Block and suspension of Roads at MYA Yard: Date Block Availability | Total Block S&T [TRD| hrs | period & Duration 3 3 hrs hrs TRD Repercussions Block Repercussions: D-5 11/12.07.2023 UP & DN 23.30- AC trains not to PB: X/MYA/A/SS/01 be dealt on Rd- . Tue/Wed 02.30 || 4. (180 mins) D- 4 3 3hrs| UP&DN | ACtrainsnotto | PB: X/MYA/A/SS/01 12/13.07.2023 | hrs 23.30- be dealt on Rd- Wed/Thu 02.30 4. (180 mins) 0-3 3 35 |. छ?ि& 0१. | ACtrainsnotto | PB: X/MYA/A/SS/01 13/14.07.2023 | hrs 23.30- be dealt on Rd- Thu/EFri 02.30 4. (180 mins) 0-2 3 2.5 UP&DN_ | ACtrainsnotto | pp: X/MYA/A/SS/01 14/15.07.2023 | hrs hrs 00.00- be dealt on Rd- Fri/Sat 02.30 4. (150 mins) D-1 16.07.2023, Preparation of preliminary works Sunday D 6 lhr | 2hrs | 6 UP No Power block section: Mon/Tue hrs hrs 23.10- movement on | 23208, 23107, 17/18.07.2023 05.10 UP lines Rd- 3 | X/MYA/SS/02 & (360 mins) | & 4, X/MYA/SS/01 DN No 1. DN AC train up to 23.10- movement on | HNK (1% 4 hours). 03.10 DN lines for 2. UP AC train up to Y (240 mins) | 1% 4 hours Speed restriction: 20 (23.10- 03.10) | KMPH hours (Rd- 1&2) Suspension of | PB: X/MYA/A/SS/01 D+1to D+4 Non Block period acuatexiettohe 18.07.2023 to Rd- 4 UP loop | ei 21.07.2023 line dealt on en Tue to Fri Speed restriction: 20 KMPH Power block section: D+5 2 Hrs UP No 22/23.07.2023 hour Hrs 22.00- movement on | 23208, 23107, Sat/Sun 07.00 (540 | UP lines Rd- 3 X/MYA/SS/02 & mins) & 4. X/MYA/SS/01 DN No 1. DN AC train up to 22.00- movement on | HNK (1% 4 hours). 02.00 DN lines for 2. UP AC train up to Y (240 mins) | 1* 4 hours Speed restriction: 20 (23.10- 03.10) | KMPH hours (Rd- 1&2) D+ 6 Rd- 4 will be | ACtrains not | PB: X/MYA/A/SS/01 24.07.2023, pm fit for to be dealt on Mon Traffic Rd- 4. D+7 2 hrs DN No PB: 23208 & 25/26.07.2023 hour 22.45- movement on | X/MYA/SS/02 Tue/Wed 04.45 DN lines Rd- DN AC train up to HNK. (360 mins) D+ 8 to D+ 11 26.07.2023 to Non Block 29.07.2023 Wed to Sat D+ 12 1hr | 2hrs 30/31.07.2023 hrs Sun/Mon Track will not | KMPH disturbed on UP line. PB: 23208 & X/MYA/SS/02 DN AC train up to HNK. Speed restriction: 20 KMPH PB: 23208 & X/MYA/SS/02 DN AC train up to HNK. Speed restriction: 20 KMPH Suspension of Rd- 1 DN loop line DN 22.00- 07.00 (540 mins) No movement on DN lines Rd- 1&2. Track will not disturbed on UP line. Rd- 1 will be fit for Traffic. 01.08.2023, 1&2. Speed restriction: 20 D+ 13 ie Tue D+ 14 e UP&DN_ | Welding of rail joints, ballasting, packing 01/02.08.2023 | hrs hrs 23.30- etc. Tue/Wed 01.30 (120 mins) D+15 e UP&DN_ | Welding of rail joints, ballasting, packing 02/03.08.2023 | hrs hrs 00.00- etc. Wed/Thu 02.00 (120 mins) D+ 16 UP&DN_ | Welding of rail joints, ballasting, packing 03/04.08.2023 00.00- etc. Thu/Fri 02.00 (120 mins) D+17.— UP & DN 04/05.08.2023 00.00- etc. Fri/Sat 02.00 (120 mins) D+ 18 UP&DN_ | Welding of rail joints, ballasting, packing 06/07.08.2023 00.40- etc. Sun/Mon 02.40 (120 mins) Repercussions:- A. Coaching repercussions:- I. Cancellation of trains:- | TrainNo. sd JCO/ Duration No. of day Remarks 06269 MYS- SMVB Exp. Spl. 22.07.2023 Will be cancelled. 2days | Will be Partially Cancelled between MAD- MYS duly short terminated at MAD. 22.07.2023 17.07.2023 | 2days | Will be Par
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,025 documents