No official Railway Board PDF has been traced for this entry yet. The text below was read from the document held in the library.
| Date | 2005-09-30 |
|---|---|
| Type | Commercial Circular |
| Topic | general |
Execution of IT projects sanctioned by Board 1 Document | Project | On ate | of | From CRIS to the Project
wa सरकार Government of India Ta मंत्रालय Ministry of Railways ve are Railway Board 1, TREAT मार्ग, नई दिल्ली, fear 30/9/2005 1, Raisina Road, New Delhi, dated 30/9/2005 संख्या No 99/C&IS/CRISMatters The General Managers All Indian Railways The Managing Director Centre for Railway Information Systems ‘Chanakyapuri New Delhi The CAO / FOIS CAO / FOIS office Chanakyapuri Neéw Delhi Sub: Execution of IT projects sanctioned by Board 1. The projects listed below shall be executed by CRIS and overall project management shall be done by CAO / FOIS organization which shall act as the project coordination agency. |06)No ४ का Name of project | Latest anticipated | 06) No | cost(Rs crore) | | NR-66 I Computerized Coaching Operations Information System (COIS) | 7.60 NR-71 | indian Railways Electronic Payment Gateway (IREPG) 2.50 | NR-76_ Ss Computerized Control Charting for indian Railways | 18.00 LM | Computerized Crew Management System for Indian Railways | 8.95 NR-64 | Web-enabling of Claims System | 2.40 | [NRTA | | Web-enabling of Claims System (Phase 1) | 2.50 | 2. The role of CRIS and CAO/FOIS is summarized at Annexure A. A list of 6 ~ deliverables, to be prepared as part of the project, is given at Annexure 8. 3. It is further advised that in case of the Computerized Control Charting System, five divisions should be taken up under FOIS estimate. 4. Adequate steps must be taken to ensure that FOIS data would be available in a data warehouse to prepare Business Intelligence reports 5. This issues in consultation with the Finance Directorate of the Ministry of Railways. Om, कि eo । ः ह a as / 4 coe When 3 (5 S/Mathur} gh जि Director (Mech Eragi C&lS Dte Annexure A: 1. CRIS would prepare the detailed estimate of its portion of the work along with detailed hardware specifications and software estimation of work and effort using any of the standard sizing methods duly vetted by its associate finance and submit it to CAO / FOIS organization. CAO / FOIS organization would add its portion of establishment etc. and process for sanction of competent authority. CAO / FOIS would enter into an agreement with CRIS, containing, amongst other things, CRIS’ payment schedule, timelines and deliverables. CRIS would carry out application design, development and testing, either in- house or through an-external agency, via vendor / technology neutral competitive bidding. CRIS would also procure the hardware through vendor- neutral open competitive bidding. After completion of the warranty period, CRIS would carry out the post-warranty application and — hardware maintenance at rates mutually agreed to between the Zonal Railway and CRIS. CAO / FOIS as the project implementation agency would monitor the project and ensure coordination with Zonal Railways and adherence to schedules through periodic joint reviews with CRIS. CAO / FOIS organization would also coordinate the implementation on the Zonal Railways. At the end of the project, CAO । FOIS would ensure the preparation of the project closing report. _ All hardware / software procured for the different projects by CRIS / CAO / FOIS would be recorded by them in separate ledgers, duly recording the reference details of tally book (T&P register) where the plant holder of the receiving railway has taken the material on his books. Annexure B: Deliverables to be prepared for projects with estimated cost exceeding Rs 50 lakh 7 ~ ' Deliverable | Type =Is tem fs Movement of the document no schedule 1 Document | Project | On ate | of | From CRIS to the Project plan project to CRIS coordination agency (Zonal Railway, CAO / FOIS etc) and Board Minimum contents of the Project plan: 1. 2. System availability: Planned system uptime at server, network, and client level System performance: Planned system response time for different program components such as transactions, periodic reports, etc Hardware and network architecture: Server locations, client locations, network topology and l
Extract shown above; the full text is available in the search app.
Open this circular in the search app · Search all 4,025 documents