CommercialPedia Indian Railways commercial circulars and policies

Any lapse in the service provided results in

Corrigendum No.53
Circularfreight
Official Railway source linkedAn official source URL is recorded; no separate verification date is published.Text extraction: mixed (13 digital + 14 OCR)

Open the official Railway source

Circular numberCorrigendum No.53
File number01.07.2024-30.06.2025
TypeRailway Board Rates Circular / Letter
Topicfreight
Official sourceindianrailways.gov.in

Summary

Train Complaint Station Complaint Track Complaint Suggestions

Text of the circular

re Public Grievances

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

• Any lapse in the service provided results in public complaints.

• PGRM was started in the year 1985 – to reduce the complaints – to find the root causes of complaints – To eliminate them

• PGRM was set up in railways at 3 levels.

– Railway Board level – Zonal level – Divisional level

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

Railway board level:

• ED/PG

• Comprises of Director General (HR), Director (Efficiency Bureau), Director (Public Relations),

Nominee of DP & AR and Secretary of RB.

• Complaints made at RB are referred to the zone.

• The zone makes all enquiries and submits report to RB.

• Reply to the party is given by the RB.

• Action will be taken as per the directions of RB

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

Zonal level:

• Additional General Manager is the director of PGRM at zonal level

• Comprises of AGM, SDGM, CPRO, PCCM, PCME,PCEE etc

• Complaints made at zonal level are referred to the division.

• The division makes all the enquiries and submits report to the zonal HQ.

• Reply to the party is given by zonal headquarters.

• Action will be taken as per the directions of the zonal HQs.

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

Divisional level:

• Additional Divisional Railway Manager is the head of PGRM at zonal level assisted by officers of various departments.

• Comprises of ADRM, Sr.DOM, Sr.DCM, Sr.DME,Sr.DEE etc.

• Complaints made at divisional level are taken up by the division.

• The division makes all the enquiries and takes action.

• Reply to the party is given by the division.

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM) Reasons for Public Complaints:

• Improper information;

• Over Charging;

• Late running of trains;

• Improper cleanliness at Stations and in Trains;

• Rude behaviour;

• Inadequacy in Amenities;

• Over Carriage of Consignments;

• Unauthorized Persons travelling in Reserve Coach

• Gents travelling in Ladies Compartment;

• Damage to Consignment etc.,

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

Lodging of complaints:

– Complaint books – Complaint boxes /Assistance booths – Directly addressed to officers – e mail – Twitter – Facebook – Call and SMS to 139 – Call to 138 – Rail MADAD (Mobile Application for Desired Assistance During travel)

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM) Time limit for disposal:

– Divisional level

- 1 week – Zonal level

- 15 days – Railway board level

- 1 month

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

Disposal of complaints made through complaint books at stations:

• Complaint book is machine numbered.

• Each form is in 3 foils namely, Record, Party, Office Copy (ADRM).

• Prepared through carbon process.

• Party should write ticket number and address.

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM) Disposal of complaints made through complaint books at stations:

• Party foil is given to the party.

• The action taken by SM is written in the columns.

• The complaint is repeated to commercial controller through phone immediately.

• Office copy (ADRM) is sent immediately.

PUBLIC GRIEVANCE REDRESSAL MACHINERY (PGRM)

Disposal of complaints made through complaint books at stations:

• Complaints inspector will process the complaint.

• If necessary inquiry will be conducted.

• Staff found at fault will be taken up as per rules.

• The action taken by railways is informed to the party.

Review & Follow up Action

• Periodical meetings should be conducted at all levels to review the functioning of PGRM.

• Emphasis should be laid on courteous behaviour.

• Critical areas where attention needed should be discussed in detail.

• Care should be taken against the recurrence of same kinds of reasons for complaints.

• HR should be educated in courteous behavior /customer relations etc. through workshops/ seminars etc.

C @ railmadad.indianrailways.gov.in/madad/final/home,jsp#

के) Log In & Sign Up

»RailMadad

A Grievance Redressal Mechanism

Ce

Extract shown above; the full text is available in the search app.

More on this subject

All freight circulars · Open this circular in the search app · Search all 6,739 documents