CommercialPedia Indian Railways commercial circulars and policies

Compendium_Weighment & Punitive Charge_updated till Feb 2026

Compendium_Weighment & Punitive Charge_updated till Feb 2026
Circularfreight
Official source verifiedRecorded Railway source checked on 2026-08-31.Text extraction: digital

Open the official Railway source

Circular numberCompendium_Weighment & Punitive Charge_updated till Feb 2026
TypeRailway Board Rates Circular / Letter
Topicfreight
DirectorateTraffic Commercial (Rates)
Official sourcenfr.indianrailways.gov.in

Summary

section(4) of section 72, such varied carrying capacity, whichever is higher; (d) “Schedule” means the Schedule annexed to these rules; (e) Words and expressions user and not defined in these rules, but defined in the Act, shall have the meanings respectively assigned to them in the Act if customer carries out load adjustment at such point, Punitive Charge shall be

Text of the circular

Compendium_Weighment of Wagons/Rakes & Punitive Charge

_____________________________________________________________________________________ 1

COMPENDIUM

“Weighment of wagons/rake, Exemption from Weighment & Procedure to deal with overloaded wagon(s) & Punitive Charge for overloading”

As prescribed vide

Rates Master Circular/Weighment/2019/0 and Subsequent Amendments/Clarifications

(Note: This is a compilation of extant guidelines on the subject matter. Reference to subsequent Board’s circulars/letters have been given with regard to amendments/clarifications and the same be referred to)

Compendium_Weighment of Wagons/Rakes & Punitive Charge

_____________________________________________________________________________________ 2

INDEX

Topic Para No.

1.

Procedure for weighment

1.0

• Weighment of rake/wagons and issue of RR

1.1

• Weighment of traffic which cannot be weighed on the loading Railway’s weighbridges due to loading station being close to Zonal inter-change point

1.2

• Speed restriction from loading point to first available weighbridge

1.3

• Weighment of container trains

1.4

• Weighment of traffic loaded at ports

1.5

• Weighment of Molasses, edible oils, Caustic soda and Coal Tar

1.6

2.

Discrepancies found on weighment/re-weighment

2.0

3.

Exemption from weighment

3.0

• Commodities loaded in standard bags of uniform size

• Containers carrying standard bags of uniform size

• Container rake loaded with empty containers

• Containerized Import traffic

• Nepal bound Containerized Import Traffic

• HR Coil and other steel consignments

• Petroleum/Metallurgical coke & Nut Coke

• Chuni and De-oiled cake

• Automobile Wagons loaded with motor vehicles

4.

Designed Tare Weight of wagons, Procedure to deal with wagon(s) found overloaded after weighment and levy of Detention Charge etc.

4.0

• Designed Tare weight of wagons

4.1(a)

• Guidelines regarding levy of Detention Charge etc.

4.3

• Computation of Engine Haulage Charge and Wagon Detention Charge in case of colliery sidings located far away from the weighment point

4.5

• Guidelines in case of container traffic

4.6

5.

Rules regarding Punitive Charge for overloading

5.0

6.

Recovery of Punitive Charge

6.0

7.

Integration of weighbridge with FOIS – Procedure to capture weighment details in TMS/FOIS and modification thereof after load adjustment of overloaded wagon

7.0

8.

System generated Weighment Sheet

8.0

9.

Zonal Railways to ensure strict compliance of the following guidelines

9.0

10.

Methodology for reckoning and collection of Detention Charge for load adjustment

10.0

Compendium_Weighment of Wagons/Rakes & Punitive Charge

_____________________________________________________________________________________ 3

1.0 PROCEDURE FOR WEIGHMENT

1.1 WEIGHMENT OF RAKE/WAGONS AND ISSUE OF RR

1.1.1 All traffic loaded from any terminals are required to be weighed at weighbridges invariably. PCCM of Zonal Railways will monitor strict compliance of extant instructions regarding weighment of wagons.

1.1.2 PCOM of each Railway will notify the Associate weighbridge(s) at which rakes loaded at each loading point for each stream are required to be weighed and advise the same to all Zonal Railways and Board’s office. Approval of the PCOM of the concerned Zonal Railway should be taken if the Associate weighbridge lies in other Zonal Railway.

Weighbridges which have been planned or are being planned, but are yet to be installed may also be notified. Weighment of loading done at stations served by these weighbridges till these become operational, will be done at an alternate weighbridge only if it is operationally not inconvenient as certified by PCOM of the Railway.

1.1.3 PCOM of each Railway will also notify Alternate Associate Weighbridge where weighment will be done if the Associate weighbridge is defective and advise the same to all Zonal Railways and Board’s office. Approval of the PCOM of the concerned Zonal Railway should be

Extract shown above; the full text is available in the search app.

More on this subject

All freight circulars · Open this circular in the search app · Search all 6,739 documents