ALP of train No.08504 and Sr.TMR of train No.08532 and 11

Text of the circular

Accident Investigation with 
DATA LOGGER REPORTS 
DIGITAL  REPORT
EXCEPTION REPORT
TRACK SIMULATION RECORDING

ACCIDENT REPORTS OF DATA LOGGER
• SYSNCHONISATION OF CLOCK
• CORRECT FUNCTIONING OF DATA LOGGER 
• HEALTHY DATALOGGR  NETWORK
• SELECTION OF SPECIFIC INPUTS 
• SELECTION OF EXACT TIME INTERVAL
• CORRECT ANALYSIS OF REPORT
• PRESENTATION OF REPORTS
• STORING OF REPORTS

Case – I
Derailment of the Rake of 
Garib-Rath Express

Derailment of the Rake of 
Garib-Rath Express  at BANDRA TERMINUS 
on 01.05.2014

Brief Description of incident
• Rake of Bhava Nagar Exp was standing on P.F-2
• Rake of Garib Rath Exp was standing on P.F-3
• SM/BDTS cleared Sh -47 for  moving the Bhavanagar Exp rake from PF 
-2
• But he wrongly  announced to start the rake of Garib rath Exp from 
PF-3
• The Pilot of Garib rath EXP followed the instruction from SM and with 
out observing the signal proceeded . 
• As a rsult the rake of Garib rath derailed on Point No 141 & 143 in 
facing direction damaging both the points

Brief Description of incident
• Noticing his fault SM/BDTS hurriedly cancelled the SH – 47 
which was cleared earlier. 
• Movement from PF -3 requires clearance of  SH -43
• To clear SH -43 Point No 141 ,149 & 143 are to be locked in 
normal setting

Observations before derailment
• The rake of Garib Rath was standing on   PF-3. 
• On PF-2 rake of Bhavnagar Express was standing.
• Both the trains had just arrived half an hour back.
G rath
Bhavanagar

Physical Observations after the incident 
• Both the tounge rails of Point 141 had moved away from their 
orignal positions.
• One of the wheel was between tounge rail and the stock rail. 
• The ground connections were intact but the rods were bent. 
• Point Machine was not damaged. Rollers seem to be O.K.
• Point 143 only one of the rod was bent. The wheel had not 
derailed on this point.

Observations after derailment

Observations of Point Locks
Point 141, which was supposed to be locked for this 
movement, was found in unlock condition.
39
141 W(R)LR
DOWN
01/05/2009 8:36:36:984
Point 143, which was also supposed to be 
locked for this movement, was found in unlock 
condition.
41
143 W(R)LR
DOWN
01/05/2009  :36:36:984

Indications of Point 141 & Point 143

Obseravtion of Sh & Route Buttons
85
SH47 GNP1R
UP
01/05/2009 08:38:44:672
104
SH47 GNP1R
DOWN
01/05/2009 08:38:45:594
84
SL UNR
UP
01/05/2009 08:38:44:625
107
SL UNR
DOWN
01/05/2009 08:38:45:625

SH-47 was operated  instead of Sh-43
• SH-47 along with route button was pressed which is 
for PF-2, and this signal was cleared. 
• SH-47 will not lock the point no 141 and 143, hence 
both W(R)LRs were down.
• No entry was found about pressing of shunt button 
SH-43 of PF-3 and hence this signal was not cleared.
• HECR of SH-47 was found to be cleared.
121
SH47 HECR
UP
01/05/2009 8:38:51:016

Operation of  of Sh-47 instead of Sh-43

Actual Time of Derailment
250
141 WKR1
DOWN
01/05/2009 08:45:44:125
Dropping of WKR1 due to the damage 
of rods of the point 141 is the actual 
time of the derailment. 
WKR1 of point 143 dropped after that.
251
143 WKR1
DOWN
01/05/2009 08:46:13:219

Cancellation of Sh-47
• By this time SM on duty came to know about the 
derailment and he cancelled the Sh-43.
257
STN EGGNR
UP
01/05/2009 08:48:10:875
260
STN EGGNR
DOWN
01/05/2009 08:48:11:047
295
STN EGGNR
UP
01/05/2009 08:52:05:969
296
STN EGGNR
DOWN
01/05/2009 08:52:06:141

Data Logger Report Sh Buttons
253
SH47 GNP1R
UP
01/05/2009 08:48:10:438
270
SH47 GNP1R
DOWN
01/05/2009 08:48:12:438
291
SH47 GNP1R
UP
01/05/2009 08:52:05:047
312
SH47 GNP1R
DOWN
01/05/2009 08:52:07:781
264
SL UNR
UP
01/05/2009 08:48:12:078
272
SL UNR
DOWN
01/05/2009 08:48:12:453
300
SL UNR
UP
01/05/2009 08:52:07:219
315
SL UNR
DOWN
01/05/2009 08:52:07:797

The actual cause
• The SM wanted to send the rake of Bhavnagar Express to the 
yard from P.F. No-2.
• He cleared the right Shunt Signal, but gave instruction to the 
wrong train, which was the rake of Garib Rath.

Track Simulation Of

Extract shown above; the full text is available in the search app.

Related circulars

Search the whole library

Open this circular in the search app · Search all 4,025 documents